Lake Carmi Lakeshore Restoration Implementation
- Response deadline
- Jul 1, 2026 Closed
- Date posted
- Jul 1, 2026
- Source
- Open notice
Description
Franklin County Natural Resources Conservation District (FCNRCD) is requesting bids from qualified contractors for the installation of a bioengineered shoreline on Lake Carmi. To request the construction drawings prepared by Fitzgerald Environmental Associates (FEA), please reach out to Jordan Duffy at jordan@feavt.com. See Bid Attachment for further details. Keywords: Construction (Non Building), Environmental Conservation Locations: Franklin Site visit: 6/17/2026 1:00:00 PM A mandatory pre-bid site visit is scheduled for Wednesday, June 17th at 1 PM. Further details about the site work will be provided during the walk-through. Interested contractors shall meet at the site, which can be accessed via a driveway between 249 and 313 Black Woods Road. The site coordinates are (44.97279, -72.88626). Please be considerate when parking as limited designated parking spots are available. Following the pre-bid meeting, questions about the scope of work should be emailed to Mel Auffredou at info@franklincountynrcd.org and Jordan Duffy at jordan@feavt.com.
Classifications
Documents (1)
- Download2026-06-08_BWA_Shoreline_RFB.pdf284 KB
Contacts
- Mel Auffredouinfo@franklincountynrcd.org(802) 5823133