Kettle Pond State Park Drinking Water System
- Response deadline
- Nov 4, 2026 Due in 23 days
- Date posted
- Nov 4, 2026
- Source
- Open notice
Description
STATE OF VERMONT CONSTRUCTION INVITATION TO BID ISSUED BY: Department of Buildings & General Services on behalf of Agency of Natural Resources – Department of Forests, Parks & Recreation Kettle Pond State Park Drinking Water System ISSUE DATE: October 6, 2026 BIDDERS CONFERENCE: There will be a non-mandatory pre-bid meeting at the site on October 20, 2026 at 2:00 PM (EST). Meet at the Kettle Pond State Park. Drive in through the main gate and meet at the first parking area (right at the Y and straight). QUESTIONS DUE: October 27, 2026 – 4:30 PM (EST) RESPONSES DUE BY: November 4, 2026 – 4:30 PM (EDT) STATE CONTACT: James Meyers, State Senior Purchasing Agent E-MAIL : BGS.OPCVendorDocs@vermont.gov Blueprints, Etc. is the official source of information for documents concerning this Invitation to Bid. Documents may be obtained from Blueprints Etc, 20 Farrell Street, South Burlington VT 05403, by phone at 802-865-4503, by fax at 802-865-0027 or email to: orders@blueprintsetc.com. Project Manuals and Plans are available for preview at: http://www.blueprintsetc.com in the Public Plan Room. Any and all notifications, releases and addendums associated with this project will be posted at http://www.blueprintsetc.com. There is a non-refundable fee, plus applicable taxes and shipping costs for each set of documents purchased. QUESTION AND ANSWER PERIOD: Any vendor requiring clarification of any section of this RFP or wishing to comment or take exception to any requirements of the RFP must submit specific questions in writing to BGS.OPCVendorDocs@vermont.gov no later than 4:30 PM on October 27, 2026. All questions should include Kettle Pond State Park Drinking Water System Project in the subject line. Any comments, questions, or exceptions not raised in writing on or before the last day of the question period are waived. At the close of the question period a copy of all questions or comments and the State's responses will be posted at http://www.blueprintsetc.com. Every effort will be made to post this information as soon as possible after the question period ends, contingent on the number and complexity of the questions. 9.2. ELECTRONIC BIDS ONLY: 9.2.1. All bids under this RFP must be submitted electronically in accordance with the submission requirements herein. Electronic bids will be accepted via email submission to BGS.VTBids@vermont.gov. The subject line of the email submission must reference the Project Title as indicated on the front page of this RFP. 9.2.2. Bids must consist of a single email with a single, digitally searchable PDF attachment containing all components of the bid. Multiple emails and/or multiple attachments will not be accepted. 9.2.3. There is an attachment size limit of 40 MB. It is the Bidder’s responsibility to compress the PDF file containing its bid if necessary in order to meet this size limitation. It is also the Bidder's responsibility to ensure that their own email system can send and receive messages up to this size. Meet at the Kettle Pond State Park. Drive in through the main gate and meet at the first parking area (right at the Y and straight). Keywords: Construction (Non Building), Construction Management, Landscaping, Mechanical Services and Repair, Storm Water System Design Locations: Caledonia Site visit: 10/20/2026 2:00:00 PM Meet at the Kettle Pond State Park. Drive in through the main gate and meet at the first parking area (right at the Y and straight).
Classifications
Documents
No documents posted for this opportunity.
Contacts
- bgs.opcvendordocs@vermont.gov(802) 8282211
Similar contracts
- Groton State Forest Beaver Depot Flood RepairsVTDue Nov 5, 2026
- Staff ClothingVTDue Oct 27, 2026
- Janitorial Services at DMV - 1998 Memorial Drive, St Johnsbury, VTVTDue Oct 21, 2026
- #2 Fuel Oil Windham District CourtVTDue Sep 18, 2026
- Statewide Elevator Inspection ServicesVTDue Jul 14, 2026
- VSARA Electrical Distribution UpgradesVTDue Jul 1, 2026