Crown Point Road Culvert Replacement Preliminary Design - Shrewsbury, VT
- Response deadline
- Sep 9, 2026 Due in 23 days
- Date posted
- Sep 9, 2026
- Source
- Open notice
Description
Rutland Natural Resources Conservation District is seeking engineering consultant design services for a culvert replacement project in the Town of Shrewsbury to restore fish passage and stream stability. The purpose of this project is to replace an undersized and perched culvert to improve aquatic organism passage (AOP) and improve stream stability on an unnamed tributary to Otter Creek. This culvert is geomorphically incompatible and perched. RNRCD seeks proposals to complete preliminary designs for the structure. The Preliminary Design and associate deliverables will be due no later than August 15, 2027. The narrative response, cost proposal and proposed timeline should be laid out to correspond to each of the major tasks under the Preliminary Design phase. A staffing summary plus one-page biographies should be included for each member of the Consultant’s team, as well as a summary of the Consultant’s experience with aquatic organism passage projects and references. Proposals shall be submitted via email as a single PDF to katie@rnrcd.org by 5:00 pm on Wednesday, September 9, 2026. Keywords: Engineering , Environmental Consultant Services Locations: Rutland
Classifications
Documents
No documents posted for this opportunity.
Contacts
- katie@rnrcd.org(802) 7796212
Similar contracts
- Russellville Rd Culvert Final DesignVTDue Jul 8, 2026