vt_business73939
Open
ADVANCED METERING INFRASTRUCTURE (AMI) SYSTEM METER REPLACEMENT PROJECT
Town of Putney · VT
- Response deadline
- Jul 27, 2026 Due in 13 days
- Date posted
- Jul 9, 2026
- Source
- Open notice
Description
The Town of Putney is a small municipality in Vermont with approximately 120 residential and commercial connections to its water system. Putney is seeking proposals from qualified vendors for an Advanced Metering Infrastructure (AMI) system to replace our existing water meters. The primary goals are 1) to improve billing accuracy; 2) to increase operational efficiency by automating all data collection; 3) enhance system integrity through leak detection and tamper alerts; and 4) implement a secure, scalable system with a long operational lifespan (minimum 20 years). Keywords: Industrial Equipment and Supplies, Plumbing and Heating Locations: Windham
Classifications
Documents
No documents posted for this opportunity.
Contacts
- Karen Astley, Town Managermanager@putneyvt.gov(802) 387-5862 Ext. 1