Trestle Pier Reconstruction at James River Reserve Fleet (JRRF)
- Response deadline
- Aug 24, 2026 Due in 6 days
- Date posted
- Aug 18, 2026
- Source
- Open notice
Description
The Maritime Administation contemplates award of a firm fixed price contract for industrial support to demolish and dispose degraded decking and uneven walkway framing of the existing trestle pier, preserve existing structural pilings, and reconstruct the pier using new framing and decking materials of a similar size profile to include handrails on steps at the James River Reserve Fleet (JRRF) shore facilities onboard Fort Eustis base compound in accordance with the Statement of Work. This combined synopsis/solicitation is published as a Total Small Business Set-Aside. Amendment 0001 is issued to correct JRRF POC Email address. Please see attached SF-30. Amendment 0002 is issued to respond to a vendor request. Please see attached SF-30 Amendment 0003 is issued to respond to questions from a vendor. Please see attached SF-30
Classifications
Documents (6)
- Trestle Pier repair SOW.pdf.pdf97 KBNot yet available
- Trestle WD.gov.pdf.pdf61 KBNot yet available
- RFQ 6933A226Q000015 JRRF Trestle Pier Repair.pdf.pdf560 KBNot yet available
- Trestle Amendment 0002.pdf.pdf237 KBNot yet available
- Trestle Amendment 0001.pdf.pdf271 KBNot yet available
- Trestle Amendment 0003.pdf.pdf454 KBNot yet available
Contacts
- robert.mcdermott@dot.gov(757) 322-5824
- william.wile@dot.gov7573205806
Similar contracts
- 127EAW26Q0037 - Dark Canyon Culvert RepairCaliforniaDue Aug 25, 2026
- 27-30 Inch Maintenance Dredging within the Geographical Boundaries of USACE Mobile DistrictDue Aug 20, 2026
- FY26 MOTSU BermsDue Aug 24, 2026
- Z2LZ--528A7-25-502 Replace Trench DrainsDue Aug 24, 2026
- Maintenance Dredging at Various Locations, Tyndall AFB, FLDue Sep 2, 2026
- USACE SPK DBB Construction - Natomas Reach I Contract 2 - Sacramento, CADue Sep 10, 2026