TARC Building 1 Roof Replacement
- Response deadline
- Aug 31, 2026 Due in 7 days
- Date posted
- Aug 24, 2026
- Source
- Open notice
Description
Update 8/24/2026: This update includes Solicitation Amendment 02, updated Statement of Work, and responses to RFIs 1-33. See attached Amendment 0002 for full details. All changes are captured in the "Summary of Changes" on page 2 of the amendment, and are also highlighted in yellow for convenience. In Summary, the changes are: 1. Period of Performance changed from 180 to 220 days. 2. Gutter references were removed from the solicitation, section 00 00 00, Key Performance Requirements - #4. 3. Add attachments: Attachment #7 – E-51 Lightning and Grounding Plan, and Attachment #8 – E-52 Lightning Protection. "TARC Roof Repair - RFI Responses 1-33 (20260824)" replaces previously posted RFI responses. Note: Statement of Work changes are highlighted in yellow for convenience of identifying changes. Update 8/17/2026: This update includes responses to all RFIs received, 1-18. "TARC Roof Repair - RFI Responses 1-18 (20260817)" replaces previously posted RFI responses. Update 8/11/2026: This update includes posting of Site Visit Attendance Sheet and Pre-Quote Conference Slides, as well as RFI responses 1-12, 14, 17 & 18. Update 8/5/2026: See attached Amendment 0001 for full details. All changes are captured in the "Summary of Changes" on page 2 of the amendment, and are also highlighted in yellow for convenience. Summary of Changes include the following: 1. Update Quote due date to 31 August 2026, 2:00pm EDT 2. Add Project Magnitude: $1M - $3M 3. Change RFQ to RFI (Typographical error on page 6) PROJECT TITLE: TARC BLD 1- ROOF REPAIR PROJECT LOCATION: ARLINGTON, VA THIS IS A COMPLETE TEAR-OFF AND REPLACEMENT PROJECT DESIGNED TO PROVIDE A NEW, WATERTIGHT, AND ENERGY-EFFICIENT ROOF SYSTEM THAT COMPLIES WITH ALL APPLICABLE STATE AND LOCAL BUILDING CODES. THE MAJORITY OF THE WORK WILL CONSIST OF ROOF SYSTEM REMOVAL, DRAIN AND PENETRATION REPLACEMENT, ROOF SYSTEM INSTALLATION, SHEET METAL AND FLASHING INSTALLATION, AND ANCILLARY WORK PER THE SCOPE OF WORK. THIS ACQUISITION IS CONSIDERED COMMERCIAL CONSTRUCTION AND FAR 12 PROCEDURES WILL BE UTILIZED AS APPLICABLE. 1. RESTRICTED: 100% SMALL BUSINESS SET-ASIDE 2. NAICS 238160 - SIZE STANDARD: $19M 3. SITE VISIT - SEE SECTION 00 21 00 INSTRUCTIONS FOR DETAILS THIS PROJECT IS BEING SOLICITED IN ACCORDANCE WITH REVOLUTIONARY FEDERAL ACQUISITION REGULATION OVERHAUL (RFO FAR) SUBPART 12.201-2, OTHER PROCEDURES, FOR ACQUISITION OF COMMERCIAL CONSTRUCTION SERVICES IN CONJUNCTION WITH RFO FAR 36.101-1(A), AND DFARS RFO DEVIATIONS 236. AWARD WILL BE MADE TO THE RESPONSIBLE OFFEROR WHOSE QUOTE CONFORMS TO THE SOLICITATION AND IS MOST ADVANTAGEOUS TO THE GOVERNMENT CONSIDERING ONLY PRICE AND PRICE RELATED FACTORS. SOLICITATIONS, INFORMATION NOTICES, AND AMENDMENTS FOR THIS SOLICITATION WILL BE POSTED AT HTTPS://SAM.GOV.
Classifications
Documents (16)
- Attachment 3 - P-11 East Penthouse.pdf.pdf1.7 MBNot yet available
- Attachment 2 - P-10 East Penthouse.pdf.pdf1.9 MBNot yet available
- Amendment 0001 - W9133L26QA018 - 20260805.pdf.pdf1.7 MBNot yet available
- Attachment 4 - P-25 West Penthouse.pdf.pdf2.1 MBNot yet available
- Attachment 7 - E-51 Lightning and Grounding Plan.pdf.pdf141 KBNot yet available
- Attachment 10 - Wage Determination VA13.pdf.pdf79 KBNot yet available
- Attachment 6 - Overall Roof Graphic.jpg.jpg12.5 MBNot yet available
- TARC Roof Repair - Site Visit - Attendance Sheet 20260810.pdf.pdf432 KBNot yet available
- Amendment 0002 - W9133L26QA018 - 20260824.pdf.pdf594 KBNot yet available
- Attachment 1 - TARC 1 Roof Plans.pdf.pdf4.8 MBNot yet available
- TARC Roof Repair - Solicitation - W9133L26QA018 - Final 20260731.pdf.pdf31.3 MBNot yet available
- Attachment 8 - E-52 Lightning Protection.pdf.pdf155 KBNot yet available
- Attachment 5 - P-26 West Penthouse.pdf.pdf2.0 MBNot yet available
- TARC Roof Repair - RFI Responses 1-33 (20260824).pdf.pdf136 KBNot yet available
- TARC Roof Repair - Pre-Quote Conference - Site Visit Slides 20260810.pdf.pdf490 KBNot yet available
- Attachment 9 - 20260824 TARC 1 Roof Replacement - SOW - Rev 1.pdf.pdf161 KBNot yet available
Contacts
Similar contracts
- Deputy Chief of Mission Roof Replacement in Cairo, EgyptDue Aug 31, 2026
- Baku Office Building Chancery Roof ReplacementDue Sep 9, 2026
- Building 333 - Roof RepairIllinoisDue Sep 8, 2026
- Charles Russell NWR Montana Roof ReplacementMTDue Sep 7, 2026
- Barlow Ranger Station Roof Replacements (Mt Hood NF)OregonDue Sep 10, 2026
- Deputy Chief of Mission Roof Replacement in Cairo, EgyptDue Aug 28, 2026