Full Start-Up Commissioning of Data Center Cooling Infrastructure and UPS battery
- Response deadline
- Sep 25, 2026 Due in 3 days
- Date posted
- Sep 22, 2026
- Source
- Open notice
Description
Offers are due 25 SEPT. The U.S. Army Corps of Engineers Headquarters has a requirement to execute the full start-up and commissioning of existing data center environmental control systems based on original design specifications, as well as the replacement and EPA-compliant disposal of batteries for an Eaton Uninterruptible Power Supply (UPS) system.This procurement will be awarded under Simplified Acquisition Procedures. There will be one site visit at the Cude Building 2592 on Friday, 18 September. The site visit is required. All contractors will need to meet at the CUDE Building 2592, 7701 Telegraph Road, Alexandria, Virginia 22315 for check-in beginning at 9am EST. All contractors who wish to be at the site visit must send their names, phone numbers, and company names to the Contract Specialist, Rick Klein, via email. All contractors must be US Citizen or US National and possess a valid Government ID. Must have driver license to enter Facilities. It is the Offeror’s responsibility to ensure the quote has been received by the contracting office via email. Fax quotes will not be accepted. Late quotes will be processed in accordance with RFO 52.212-1(c) “Late submission, modifications, revisions, and withdrawals of offers.” Upon receipt of the electronic offer, the Government will acknowledge receipt of that offer via email to the Offeror.
Classifications
Documents (4)
- CSS_Full Start-Up Commissioning of Data Center Cooling (002).pdf.pdf461 KBNot yet available
- Questions and Answers- 22 Sep 26.pdf.pdf501 KBNot yet available
- CSS_Full Start-Up Commissioning of Data Center Cooling.pdf.pdf431 KBNot yet available
- SOW.pdf.pdf340 KBNot yet available
Contacts
Similar contracts
- Fire Alarm UpgradeVirginiaDue Sep 23, 2026
- Electrical Services - Sleepy Eye, MN 56085MinnesotaDue Sep 24, 2026
- Electronical IPC PDS MaintenanceArizonaDue Sep 25, 2026
- AMENDMENT 0002_NRCS Puerto Rico Backup Battery Power System for Corozal Field OfficePuerto RicoDue Sep 23, 2026
- Black Rock Lock High Mast Lighting ProjectDue Oct 22, 2026
- Removal of Abandoned Telecommunications EquipmentDistrict of ColumbiaDue Sep 28, 2026