Civic AI
Civic AI
Procurement intelligence
SAM.govN0018926QL196
Open

Fitness Equipment Maintenance

DEPT OF DEFENSE · Virginia
Response deadline
Aug 24, 2026
Due in 6 days
Date posted
Aug 18, 2026

Description

The instant requirement is for routine maintenance, repair, and purchasing of replacement parts for machines manufactured by TruFitness Equipment, Life Fitness Equipment, and Hammer Strength. Scope 1. Provide preventative and corrective maintenance in accordance with the manufacturer’s recommendations.to the following: Manufacture is TruFitness Equipment, Life Fitness Equipment and Hammer Strength. a. Elliptical/Cross Trainer Machine (qty 4) b. Treadmill (qty 5) c. Flex strider (qty 3) d. Upright Bike (qty 2) e. Recumbent bike (qty 2) f. Spinner Bike (qty 2) g. Chest (Multi-Press) Exercise machine (qty 1) h. Fly/rear deltoid/Pectoral machine (qty 1) i. Leg curl and extension machine (qty 1) j. abdominal machine (qty 1) k. rower machines (qty 2), l. Barbells (20lbs – 110 lbs. with rack) (qty 1 set) m. Flat weight bench (qty 1) n. Kettlebells (qty 1 set) o. Vertical Smith (qty 1) p. Plate Loaded Row (qty 1) q. Olympic Squat Rack (qty 1) r. Utility Bench (qty 1) s. Plate Loaded Linear Leg Press (qty 1) t. Olympic Flat bench (qty 1) u. Plate Loaded Kneeling Leg Curl (qty 1) v. Plate Loaded Leg Extension (qty 1) 2. Reupholster benches, pads, and other equipment/items on site with material that meets or exceeds the original manufacturer fabric/vinyl/rubber. 3. Replace end caps, protective covers, and trim pieces as required on all equipment in the fitness center. 4. Perform parts replacement and sanding and painting as necessary to remove and prevent rust on metal parts. 5. Inspect all equipment in the fitness center and lubricate guide rods, pulleys, and any moving parts as appropriate per manufacturer recommendations. 6. Provide a list of replacement parts required, with description of reason for replacement and replacement cost, to be installed/replaced during the next scheduled visit, to keep all equipment in nominal operational order. 7. Services shall be performed quarterly in accordance with manufacturer’s frequency. 8. Provide up to a single visit per contract period to respond to defects that may need urgent attention due to a safety issue such as exposed sharp edges, frayed electrical cables or other similar defect. Security Requirements: COMPLEX ACCESS AND ESCORTING This PWS requires all contractor personnel to obtain a ‘green’ contractor badge. This badge allows the contractor personnel to gain access to and remain inside the fitness center without needing a dedicated escort. This requires a thorough background check be performed for all contractor personnel that must have access to accomplish the contract

Classifications

Documents (1)

  • Solicitation - N0018926QL196.pdf
    .pdf1.8 MBNot yet available

Contacts

Similar contracts

Explore more