1 FW Network Install
- Response deadline
- Sep 23, 2026 Closed
- Date posted
- Sep 11, 2026
- Source
- Open notice
Description
The contractor shall provide all management, transportation, tools, supplies, equipment, and labor necessary to install Network Infrastructure, Blue-Light Rotating Beacon Light System, and Closed-Circuit Television (CCTV) installation at Joint Base Langley-Eustis (JBLE), Langley Air Force Base (LAFB), Virginia (VA), in a manner that shall ensure continuous and reliable service.This project encompasses room-by-room fiber and copper network installations, surface-mounted conduits, electrical upgrades in Server Room 247, a comprehensive blue-light warning rotating beacon light system, and a secure, high-definition 4K CCTV surveillance system across multiple operational rooms. Physical Address: 196 E. Flightline Road, B. 749 Hampton, VA Site visit will take place 16 Sept at 1000 EST at the below location. Please find attached the completed JBLE Form, Page 3, needs to be filled out for Base Access and sent to the POC. Upon arrival please check in at the Langley VCC to obtain the base access pass. Please arrive 30 mins prior to allow time to collect your visitor badge. Langley Visitor Control Center Address: 11 Nealy Ave, Langley Air Force Base, VA 23665 To receive base access, please reach out to Alyson Moore alyson.moore.1@us.af.mil and 2nd Lt Sigourney Rosario sigourney.rosario@us.af.mil.
Classifications
Documents (5)
- Site Address.pptx.pptx1.1 MBNot yet available
- Wage Determinaton 2015-4341 Rev 36.pdf.pdf346 KBNot yet available
- JBLE FORM 1 - MAY 2025 (V5).pdf.pdf660 KBNot yet available
- FW Combined Synopsis.pdf.pdf320 KBNot yet available
- SOW Network Infrastructure Installation.pdf.pdf1.2 MBNot yet available
Contacts
Similar contracts
- FY27 Electrical Test and CalibrationsNYDue Nov 13, 2026
- 657A5-26-111, Triennial Electrical TestingIllinoisDue Nov 13, 2026
- 460-24-009 CLC and Fourth Floor Patient Elopement SystemDEDue Nov 16, 2026
- 106 Ce Electrical Loop RepairDue Nov 10, 2026
- Project No. 583-22-106- Replace Electrical Panels & Expand DistributionDue Dec 9, 2026
- Tri-Annual PM & Testing of Switch Gears - Base YearDue Nov 12, 2026