Civic AI
Civic AI
Procurement intelligence
SAM.govW50S8526BA004
Open

VGLZ 242009 Repair and Seal Floors in B825

DEPT OF DEFENSE
Response deadline
Date posted
Jun 11, 2026

Description

The work shall be in strict compliance with this SOW, the project specifications, and the project drawings. Sections of this SOW may supersede the requirements found in the specifications, in which case, the more stringent/higher quality requirements shall apply. All work will be coordinated with Base Operations. The Contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary to repair and seal the floors in building 825. Caulk all expansion joints and visible cracks as shown in the attached project drawings, in accordance with this Statement of Work (SOW). The contractor shall perform to the standards outlined in the contract.

Classifications

Documents (1)

  • attachment
    Not yet available

Contacts

Explore more