GMF Hapgood Pond Dam Spillway Bridge Support
- Response deadline
- Sep 3, 2026 Closed
- Date posted
- Aug 12, 2026
- Source
- Open notice
Description
Solicitation number 12445526Q0126 is issued as a Request for Quotation (RFQ) for GMF Hapgood Pond Dam Spillway Bridge Support. PROJECT SUMMARY: This project is for construction services to repair Hapgood Pond Dam bridge supports, on the Green Mountain National Forest. Work includes but is not limited to cleaning and preparing the existing concrete and wingwall surface; drilling and grouting rebar into existing concrete; placing rebar and forms; and placing new concrete bridge supports. SET-ASIDE: This solicitation is set aside 100% for Small Business entities under 237310 - Highway, Street, and Bridge Construction (Size Standard: $45M). PROJECT LOCATION: Hapgood Pond Dam, Green Mountain National Forest. See solicitation and its attachments for additional location details. PROJECT MAGNITUDE: Under $25,000 SOLICITATION POINT OF CONTACT: Matthew (Matt) Killian, Contracting Officer; matthew.killian@usda.gov PLEASE REVIEW ALL SOLICITATION MATERIALS IN-FULL, INCLUDING ALL INSTRUCTIONS TO OFFERORS, PRIOR TO SUBMITTING A QUOTATION. LATE QUOTATIONS AND/OR QUOTATIONS THAT DO NOT COMPLY WITH SAID INSTRUCTIONS MAY BE DETERMINED NON-REPONSIVE AND ELIMINATED FROM AWARD CONSIDERATION.
Classifications
Documents (6)
- DownloadC04_RFQ_12445526Q0126.pdf.pdf1.6 MB
- DownloadC04c_Att 3-Supp Specs_12445526Q0126.pdf.pdf189 KB
- DownloadC04d_Att 4-DBAWD_VT20260049_12445526Q0126.pdf.pdf36 KB
- DownloadC04a_Att 1-SOW_12445526Q0126.pdf.pdf222 KB
- DownloadC04b_Att 2-Plans_12445526Q0126.pdf.pdf2.2 MB
- DownloadC04e_Att 5-Fillable SOI_12445526Q0126.xlsx.xlsx14 KB
Contacts
Similar contracts
- Notice of Intent (NOI) to Sole Source for SAFB Taxiway Repairs at SAFB, ILIllinoisDue Oct 14, 2026
- CO NP BLCA 10(1) South Rim DriveColoradoDue Oct 8, 2026
- Opportunity Available to NM FERM BPA Zone 1 Contractors ONLY with the USDA Forest ServiceNew MexicoDue Oct 22, 2026
- Bonneville Lock and Dam - Navigation Lock 1 Bridge ReplacementOregonDue Oct 8, 2026
- Sidewalk Replacement Throughout Lyons CampusDue Oct 9, 2026
- Airfield Civil Works IDIQDue Oct 5, 2026