SAM.govFA302926R0006
Open
Vance AFB: Unsuppressed Power Check Pad
- Response deadline
- Aug 27, 2026 Closed
- Date posted
- Jul 10, 2026
- Source
- Open notice
Description
The work will include the complete replacement of round concrete pad and tow way pavement of the circular pad on the southeast side of the Vance aircraft parking apron. This pad is required for the testing of aircraft engines and has a specific steel anchor designed to anchor aircraft. Details for the replacement are found in the construction drawing and project specifications.
Classifications
Documents (1)
- attachmentNot yet available
Contacts
- jessica.wheeler.12@us.af.mil5802136726
- teresa.hess.1@us.af.mil5802136726
Similar contracts
- Munitions Maintenance and Inspection (M&I) Facility & Conventional Munitions Cube Storage Addition, HIANG, JBPHH, HIHawaiiDue Sep 16, 2026
- https://api.sam.gov/prod/opportunities/v1/noticedesc?noticeid=05987caa4ecd43b4bd672664ecc1315dHawaii
- Total Maintenance for Critical Facilities at USAG Humphreys and Camp YonginDue Sep 29, 2026
- FEMA Region 6 Federal Regional Center Upper-Level Watch RenovationTexasDue Sep 2, 2026
- Well #11 - Well, Rehabilitation, and Pump Building 1530 STAG4F FMDNorth CarolinaDue Sep 9, 2026
- 657-24-111JC FCA-Renovate Ambassador Suite & Main Lobby B1Due Sep 15, 2026