SAM.govFA302926R0006
Open
Vance AFB: Unsuppressed Power Check Pad
DEPT OF DEFENSE
- Response deadline
- Aug 27, 2026 Due in 41 days
- Date posted
- Jul 10, 2026
- Source
- Open notice
Description
The work will include the complete replacement of round concrete pad and tow way pavement of the circular pad on the southeast side of the Vance aircraft parking apron. This pad is required for the testing of aircraft engines and has a specific steel anchor designed to anchor aircraft. Details for the replacement are found in the construction drawing and project specifications.
Classifications
Documents (1)
- attachmentNot yet available
Contacts
- Jessica Wheelerjessica.wheeler.12@us.af.mil5802136726
- Teresa Hessteresa.hess.1@us.af.mil5802136726