Whole Building Generator Installation for the Benjamin Franklin Middle School West
- Response deadline
- Jun 2, 2026 Closed
- Date posted
- May 11, 2026
- Source
- Open notice
Description
The project is generally described as installing a Whole Building Generator System consisting of 1,000 KVA Diesel Generator, Enclosure, Lights, Panelboard, Receptacle, Belly Tank, Fuel Polisher, Control Kit to upgrade an existing Manual Transfer Switchgear to and Automatic Unit, Concrete Pad, Feeder Circuits, Branch Circuits, Conduits, grounding, interconnections, control equipment, grading, seeding, diesel fuel, testing and etc. The Contractor shall make all interconnections for equipment and bolt that equipment to the pads, provide all diesel fuel, control equipment and wiring, all conduits, grading, trenching, backfill, main pad and pads, all 480V, 277V, and 120V wiring, secondary wiring, generator lights, generator receptacle, generator panel, labels, setup testing and etc. BID No. 06022026-1400
Documents
No documents posted for this opportunity.