Civic AI
Civic AI
Procurement intelligence
va_eva120050
Open

Whole Building Generator Installation for the Benjamin Franklin Middle School West

Response deadline
Jun 2, 2026
Closed
Date posted
May 11, 2026

Description

The project is generally described as installing a Whole Building Generator System consisting of 1,000 KVA Diesel Generator, Enclosure, Lights, Panelboard, Receptacle, Belly Tank, Fuel Polisher, Control Kit to upgrade an existing Manual Transfer Switchgear to and Automatic Unit, Concrete Pad, Feeder Circuits, Branch Circuits, Conduits, grounding, interconnections, control equipment, grading, seeding, diesel fuel, testing and etc. The Contractor shall make all interconnections for equipment and bolt that equipment to the pads, provide all diesel fuel, control equipment and wiring, all conduits, grading, trenching, backfill, main pad and pads, all 480V, 277V, and 120V wiring, secondary wiring, generator lights, generator receptacle, generator panel, labels, setup testing and etc. BID No. 06022026-1400

Documents

No documents posted for this opportunity.

Explore more