Replace Chiller York 2075
- Response deadline
- May 20, 2026 Closed
- Date posted
- Apr 28, 2026
- Source
- Open notice
Description
The contractor shall provide supervision, labor, material and equipment required to perform all work for the following project: Replace Chiller York 2075. The work includes the decommissioning of the existing 100-ton chiller, its relocation to a new site approximately two (2) miles away near the chiller unit at York 1595, and the complete supply, installation, and commissioning of a new high-efficiency 100-ton air-cooled scroll packaged chiller at the original location. Replace all insulation, heat tape, aluminum jacketing, pressure and temperature gauges on water lines above existing concrete pad. The contractor is responsible for providing all labor, materials, tools, equipment, and supervision required to execute this project safely and in compliance with all applicable codes and standards.
Classifications
Documents
No documents posted for this opportunity.
Similar contracts
- Turn Key Chiller Equipment (Purchase and Install)LouisianaDue Nov 30, 2026
- Replacement of 10 Ton HVAC Unit, Bldg.11, PR ANGPuerto RicoDue Nov 3, 2026
- USCG Station Lake Worth Inlet HVAC Diagnostic and RepairsFloridaDue Nov 12, 2026
- El Paso Lift Station Piping RepairDue Oct 27, 2026
- Watervliet Arsenal (WVA) Replacement of the 300 Line Chrome PipingDue Oct 29, 2026
- FY27 Danville Mechanical MATOC SEED PROJECT NO: 550-26-106, Replace Air Handling Unit B58 at the VA Illiana Health Care System (VIHCS), Danville ILDue Dec 15, 2026