Replace Chiller York 2075
- Response deadline
- May 20, 2026 Closed
- Date posted
- Apr 6, 2026
- Source
- Open notice
Description
The contractor shall provide supervision, labor, material and equipment required to perform all work for the following project: Replace Chiller York 2075. The work includes the decommissioning of the existing 100-ton chiller, its relocation to a new site approximately two (2) miles away near the chiller unit at York 1595, and the complete supply, installation, and commissioning of a new high-efficiency 100-ton air-cooled scroll packaged chiller at the original location. Replace all insulation, heat tape, aluminum jacketing, pressure and temperature gauges on water lines above existing concrete pad. The contractor is responsible for providing all labor, materials, tools, equipment, and supervision required to execute this project safely and in compliance with all applicable codes and standards.
Classifications
Documents
No documents posted for this opportunity.
Similar contracts
- FY27 HVAC Maintenance ServiceVirginiaDue Nov 13, 2026
- J041--HVAC RepairAKDue Nov 4, 2026
- John Day Dam Powerhouse HVAC Upgrades (W9127N27BA007)Due Dec 28, 2026
- MXRD 26-0101 Clean HVAC VentsMassachusettsDue Nov 6, 2026
- L7WC02_ B670 Paint Booth and HVACGeorgiaDue Nov 12, 2026
- NEW - Energy Center Steam Header& Boilers valves, gaskets, and vent replacementTXDue Nov 9, 2026