va_eva125158
Open
Repair Section of Tile Kitchen Floor
- Response deadline
- Aug 17, 2026 Due in 19 days
- Date posted
- Jul 28, 2026
- Source
- Open notice
Description
Furnish all labor, supervision, equipment, tools, and materials as necessary to perform a selective demolition of approximately 210 square feet of existing quarry tile floor in the Kitchen. Remove deteriorated tile and grout and prepare area for new epoxy floor covering.
Documents
No documents posted for this opportunity.