OpenGov / Ionwave22431
Open
Military Circle Mall Demolition and Alterations
- Response deadline
- Jul 13, 2026 Closed
- Date posted
- May 29, 2026
- Source
- Open notice
Description
The work under this project involves the systemic demolition of all existing above-grade structures within the Military Circle Mall complex, down to the existing concrete slab-on-grade. The Ross tenant place, Sentara building, and other designated locations are excluded from the scope of work and shall remain undisturbed. The Bidder shall provide a Lump Sum cost to provide all labor, material, equipment, and supervision required to perform the work as described herein.
Documents
No documents posted for this opportunity.
Similar contracts
- St. Paul's Blue-Greenway - Stormwater PhaseVADue Dec 14, 2026
- Virginia Beach Blvd Over NS RR Bridge RehabilitationVADue Nov 16, 2026
- CSRM Phase 1A Floodwall Construction - Preload & Wick DrainsVADue Oct 29, 2026
- Virginia Zoo - Africa Boardwalk RepairsVADue Nov 12, 2026
- Thermoplastic Pavement Markings FY27 IDQ (MAC)VADue Oct 9, 2026
- Harbor Park Boxing Center - Electrical Service RelocationVADue Oct 2, 2026