va_eva119237
Open
James River Water Treatment - 10-inch Flow Control Valve Rebuild (3)
- Response deadline
- May 12, 2026 Closed
- Date posted
- Apr 29, 2026
- Source
- Open notice
Description
Remove, rebuild and reinstall three (3) 10-inch Flow Control Valves at the James River Water Treatment PlantMANDATORY PREBID CONFERENCE - See Section II. Prebid Conference.
Documents
No documents posted for this opportunity.