Cedar Lake Water System Improvements
- Response deadline
- May 13, 2026 Closed
- Date posted
- Apr 14, 2026
- Source
- Open notice
Description
SCOPE OF WORK â This project consists of providing all labor, materials, equipment, tools, and other required incidentals and ancillary items as required to construct, complete and in-place, approximately: 9 linear feet of 12-inch, 1,570 linear feet of 8-inch and 4-inch diameter ductile iron water main; associated appurtenances; and, interconnections. Appurtenant work includes installation of: fittings; joint restraints; air release; connections to the existing system; demolition and abandonment of the existing pipelines; site restoration; and, other miscellaneous items as required in order to complete the Work, as specified in the Contract Documents. Erosion and sediment control as well as any temporary traffic control for site ingress/egress is included in the Project Scope.
Documents
No documents posted for this opportunity.