va_eva118794
Open
260-B4260-103 an Replace Underground Storage Tanks
- Response deadline
- May 26, 2026 Closed
- Date posted
- Apr 23, 2026
- Source
- Open notice
Description
This project includes the removal of existing below-ground fuel tanks, installation of new above-ground fuel tanks, replacement of the fuel dispenser, connection to the existing building EMCS, provision of a new air pump at the fuel island, and installation of a new convenience receptacle. This project is split into two volumes. Volume 1 which includes all of the scope listed above besides the physical fuel tank installation and volume 2 which only includes thephysical fuel tank installation.
Documents
No documents posted for this opportunity.