260-A9260-018 Trail Bridge Replacement & Stream Stabilization
- Response deadline
- Aug 24, 2026 Closed
- Date posted
- Aug 13, 2026
- Source
- Open notice
Description
The project is generally described as âreplacing the existing pedestrian bridge and performing stream stabilization in thesurrounding channel in accordance with the plans. The work includes installation of grade control features such as constructed riffles, step pools, and log/stone structures to stabilize the stream bed and banks, reduce erosion, and restore natural channel function. Stream banks will be regraded and stabilized with matting and native vegetation, and all in-stream work will be performed in accordance with erosion and sediment control requirements. Civil work includes site grading, demolition of the existing structure, installation of erosion and sediment controls, temporary stream diversion, and restoration of disturbed areas. The new bridge will be constructed to accommodate pedestrian and maintenance access and will be coordinated with the stream restoration to ensure long-term stability and hydraulic performance.
Documents
No documents posted for this opportunity.
Contacts
Similar contracts
- 260-B5260-065 LA Add Medical Oxygen GeneratorVADue Sep 8, 2026
- 260-B4260-065 Medical Campus- Install AwningsVADue Sep 30, 2026
- 260-B5260-049 LC Medical Education LabVADue Sep 28, 2026
- Uniform Cleaning Services (to include Pick-up, Sorting, Cleaning, Labeling and Delivery)VADue Sep 1, 2026
- 260-B4260-058 NVCC Renovate 3rd Floor LabVADue Sep 21, 2026
- 260-B5260-055 AL AE Building Wall Crack RepairVADue Aug 20, 2026