OpenGov / Ionwave22236
Open
Rehabilitation of Robin Hood Road Bridge (UPC 121778)
- Response deadline
- Jul 17, 2026 Closed
- Date posted
- Jun 18, 2026
- Source
- Open notice
Description
This is a state and federally funded project to rehabilitate the Robin Hood Road Bridge. The scope includes deck slab closures, milling and latex concrete overlay, concrete substructure surface repair, pavement markings, and a bid additive for railing replacement. DBE Goal: 0%. UPC 121778, 0122-122-519, BFP-5B03(522). Notes: All bidders must be VDOT Prequalified Contractors to be considered and awarded the contract for this project. Contract to be awarded based of the base bid.
Documents
No documents posted for this opportunity.
Similar contracts
- St. Paul's Blue-Greenway - Stormwater PhaseVADue Dec 14, 2026
- Virginia Beach Blvd Over NS RR Bridge RehabilitationVADue Nov 16, 2026
- CSRM Phase 1A Floodwall Construction - Preload & Wick DrainsVADue Oct 29, 2026
- Virginia Zoo - Africa Boardwalk RepairsVADue Nov 12, 2026
- Thermoplastic Pavement Markings FY27 IDQ (MAC)VADue Oct 9, 2026
- Harbor Park Boxing Center - Electrical Service RelocationVADue Oct 2, 2026