SAM.gov6982AF26Q000020
Open
UT FLAP SJC 285(1) Johnson Creek Paving - Geotechnical Drilling
- Response deadline
- Sep 2, 2026 Closed
- Date posted
- Aug 19, 2026
- Source
- Open notice
Description
The geotechnical drilling scope of work for the UT FLAP SJC 285(1) project involves obtaining subgrade soil samples along a 4.5-mile unpaved stretch of Johnson Creek Road in San Juan County, Utah, to support future paving. Over a planned two-day period, a contractor-provided two-man crew must complete twenty shallow (5-foot) and four deep (25-foot) borings using a truck-mounted drill rig. The contractor is also fully responsible for providing required MUTCD-compliant traffic control services during all field operations.
Classifications
Documents (1)
- 6982AF26Q000020.pdf.pdf1.5 MBNot yet available
Contacts
Similar contracts
- Flowmeter, Calibration, and Signal Conditioners Needed for Panel Modification for EsrDue Oct 22, 2026
- Calibration and Temperature MappingTexasDue Oct 28, 2026
- Granite Surface Plate Calibration and lappingIllinoisDue Nov 9, 2026
- B--Metagenomics & Transcriptomic ServicesDue Oct 28, 2026
- Chemical Nutrient Analysis Service for Combat Feeding Division (CFD)MassachusettsDue Oct 29, 2026
- Advanced Safety Research Multiple Award Indefinite Delivery, Indefinite Quantity (IDIQ)Due Dec 30, 2026