USEB262315 - B302 ISRG Ops HVAC Increase
- Response deadline
- Aug 27, 2026 Due in 8 days
- Date posted
- Aug 19, 2026
- Source
- Open notice
Description
Project: USEB262315 - B302 ISRG Ops HVAC Increase Reference RFQ# W50S9A26QA015 19 Aug 2026 Amendment 0001: The purpose of this Amendment (0001) to Solicitation RFQ# W50S9A-26-Q-A015 (B302 ISRG Ops HVAC Increase) is to incorporate administrative updates, answer active vendor questions, and distribute critical technical attachments.Please review all amendment documentation for full information. The solicitation due date as been extended as result of this amendment. Requesting Agency: 151 Intelligence Surveillance and Reconnaissance Group (ISRG), Utah Air National Guard Purchasing Agency: 151 MSG/MSC, Utah Air National Guard, Roland R. Wright ANG Base, Salt Lake City, Utah 84116 Background: This project provides an HVAC solution for the Building 302 Intelligence Operations Floor and adjacent rooms within an accredited ICD 705 Facility. The work consists of: a new nominal 10 or 15-ton ducted split heat pump system serving the bullpen and two interior rooms; a new energy recovery ventilator (ERV); retention and rebalancing of existing AHU-1 to serve three exterior Rooms; and demolition of the existing 7.5-ton roof top unit and two out-of-service computer room AC units, with associated roof work. This acquisition is being procured as a total small business set-aside. The North American Industrial Classification System (NAICS) code is 238220 "Plumbing, Heating, and Air-Conditioning Contractors" and the size standard of no more than $19M. A single award will be made as a result of the evaluation of quotes received. Site Visit Information: The Government will conduct a formal site visit for all prospective offerors at: Roland R. Wright Air National Guard Base 765 N 2200 W, Bldg. 210 Salt Lake City, UT 84116. Please see the attached Site Visit Instructions for full information. Attendance is highly encouraged to verify existing site conditions, take measurements, and assess the space for proposed planning and design. The registration deadline for submissions is no later than close of business three business days prior to the schedule site visit. Quotations in response to this solicitation shall be submitted via email to: SMSgt Lyndi Bell at lyndi.bell.2@us.af.mil Capt Jemimah Griggs at jemimah.griggs.1@us.af.mil Please see the attached documents for all terms and conditions of this solicitation.
Classifications
Documents (18)
- USEB262315 - 5b. Mechanical As-Builts.pdf.pdf12.9 MBNot yet available
- Solicitation Amendment 0001 W50S9A26QA015 SF30.pdf.pdf3.8 MBNot yet available
- Wage Determination UT20260058 - 18 May 2026.pdf.pdf1.5 MBNot yet available
- USEB262315 - 5k. Bldg 302 Structural As-Builts.pdf.pdf4.4 MBNot yet available
- USEB262315 - 5h. - ICD 705 Tech Specs.pdf.pdf7.1 MBNot yet available
- USEB262315 - 5c. Template - Hazardous Material Identification Form.pdf.pdf314 KBNot yet available
- USEB262315 - 5i. Supplies to be capped.pdf.pdf1.5 MBNot yet available
- USEB262315 - 5f. CRU2 Nameplate.pdf.pdf1.4 MBNot yet available
- USEB262315 - 5l. HVAC Pictures Bldg. 302.pdf.pdf4.6 MBNot yet available
- Solicitation - W50S9A26QA015 Amend 0001.pdf.pdf6.8 MBNot yet available
- USEB262315 - 5. B302 ISRG HVAC SOW_16Jul2026.pdf.pdf267 KBNot yet available
- USEB262315 - 5d. UTANG EMS Brochure (Services).pdf.pdf6.6 MBNot yet available
- USEB262315 - 5j. Electrical As-Builts.pdf.pdf13.2 MBNot yet available
- USEB262315 - 5e. 7.5 RTU Nameplate.pdf.pdf1.3 MBNot yet available
- USEB262315 - 5. B302 ISRG HVAC SOW_18Aug2026.pdf.pdf262 KBNot yet available
- USEB262315 - 5g. CRU3 Nameplate.pdf.pdf1.4 MBNot yet available
- W50S9A26QA015 Questions - Answers.pdf.pdf50 KBNot yet available
- Site Visit Instructions - USEB262315 - B302 ISRG Ops HVAC Increase.pdf.pdf181 KBNot yet available
Contacts
- jemimah.griggs.1@us.af.mil8012452874
- lyndi.bell.2@us.af.mil8012452340
Similar contracts
- Acquisition of Fan Coil UnitsAşgabatDue Sep 3, 2026
- HVAC REFURBISHMENT CU-9_NHOTICDue Sep 12, 2026
- N041--Building 4 Chiller Replacement at VAMC Central Western MAMADue Aug 31, 2026
- Torit Dust Extraction System Service and Maintenance for the NMUSNDue Aug 25, 2026
- N041--Amendment# 1 Site Visit Date and Time & Answer to Contractor QuestionsFLDue Aug 26, 2026
- STATION NEAH BAY INSTALL COMPLETE HVAC SYSTEM FOR GYMWashingtonDue Aug 28, 2026