GAOA Tony Grove Dam Spillway Capacity & Seismic Mitigation, Uinta/Wasatch/Cache National Forest
- Response deadline
- Nov 3, 2026 Due in 28 days
- Date posted
- Oct 5, 2026
- Source
- Open notice
Description
This is a combined synopsis/solicitation for commercial construction prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation; quotes are being requested, and a separate written solicitation will not be issued. Solicitation number 1240BH27Q0002 is issued as a Request for Quotation (RFQ) for the Tony Grove Dam Spillway Capacity & Seismic Mitigation on the Uinta/Wasatch/Cache National Forest. This project consists of reconstructing portions of the Tony Grove Dam as shown in the drawings and described in the specifications. This also includes replacing outlet works and raising the dam crest along with the addition of embankment material. This acquisition is set-aside for small business concerns. The applicable North American Industry Classification System Code is 237990. The small business size standard is $45 Million. This acquisition is a total Small Business set-aside. All responsible sources may submit a quotation which will be considered by the agency.
Classifications
Documents (5)
- C04 Attachment 3 - Specifications Tony Grove.pdf.pdf1.7 MBNot yet available
- C04 Attachment 5 - DBA WD UT20260105 Cache Co 051826.pdf.pdf1.6 MBNot yet available
- C04 Attachment 1 - Solicitation Tony Grove.pdf.pdf868 KBNot yet available
- C04 Attachment 4 - Drawings Tony Grove.pdf.pdf9.2 MBNot yet available
- C04 Attachment 2 - SOI Tony Grove.xlsx.xlsx20 KBNot yet available
Contacts
Similar contracts
- Unit Price Contract for Maintenance Dredging of Pensacola Harbor Entrance ChannelDue Oct 13, 2026
- Y--JELA 325250 335621 - Rehabilitate Chalmette National Cemetery at Jean Lafitte N
- NAICS 237990 PSC Y1PZ--CONS: 909CM3030 Fort Custer NC - Cemetery Expansion and Site ImprovementsMichiganDue Oct 6, 2026
- Osceola Harbor Dredging Extension
- Bayou Meto Canal 1000, Phase 4.1, Check StructureDue Nov 5, 2026
- Z--Alpo Stabilization of Staple Bend TunnelDue Oct 30, 2026