SAM.govFA822226Q3345
Open
16292 Steam Boiler Replacement
DEPT OF DEFENSE · Utah
- Response deadline
- Oct 19, 2026 Due in 20 days
- Date posted
- Sep 29, 2026
- Source
- Open notice
Description
Upgrade the existing heating infrastructure in building 1515 on Hill AFB in accordance with the Statment of Work. The objective is to transition from the current steam heat exchanger system to a more efficient, decentralized gas-fired hot water boiler system.
Classifications
Documents (21)
- A006 - Accident-Incident Report DI-SAFT-81563.pdf.pdf56 KBNot yet available
- Bldg- 1515 WT 18773888 Removal of Steam Lines.pdf.pdf291 KBNot yet available
- A001 - Conceptual Design Drawings Models DI-SESS-8100E.pdf.pdf56 KBNot yet available
- G14_Hill_AFB_IFS_Electrical.pdf.pdf400 KBNot yet available
- A003 - Quality Assurance Program Plan (QAPP) DI-QCIC-81794B.pdf.pdf56 KBNot yet available
- 3-inch gas line at B1515.png.png1013 KBNot yet available
- Phase 1 as-built mechanical.pdf.pdf2.5 MBNot yet available
- RFIs for Bldg 1515.xlsx.xlsx32 KBNot yet available
- B1515 phases 3 and 4 gas lines.png.png298 KBNot yet available
- A005 - System Safety Program Plan DI-SAFT-81626.pdf.pdf56 KBNot yet available
- A002 - System - Subsystem Specification (SSS) DI-ISPC-81431A.pdf.pdf56 KBNot yet available
- 16292 Boiler Replacement SOW (9-4-26) Final.pdf.pdf647 KBNot yet available
- 16292 Solicitation Boiler Replacement.pdf.pdf287 KBNot yet available
- Pages from FY06 FY07 As-Builts Vol 2.pdf.pdf1.8 MBNot yet available
- G07_Hill_AFB_IFS_Mechanical_Systems_Design_Requirements.pdf.pdf465 KBNot yet available
- G10_Hill_AFB_IFS_Natural_Gas_LPG.pdf.pdf208 KBNot yet available
- B1515 phase 2 gas line.png.png254 KBNot yet available
- Phase 2 as-built mechanical.pdf.pdf15.3 MBNot yet available
- A004 - As Built Configuration List DI-SESS-81830.pdf.pdf56 KBNot yet available
- 16292_Wage Determinations.pdf.pdf61 KBNot yet available
- B1515 phase 1 gas line.png.png174 KBNot yet available
Contacts
Similar contracts
- E21 Prca HVAC ReplacementDue Oct 27, 2026
- Lower Monumental PH HVAC System UpgradeWashingtonDue Oct 5, 2026
- Con | Z1Da | Replace or Chillers | 580-23-105 | PresolicitationTexasDue Oct 12, 2026
- Con | Z2Da | Replace Chiller 1 B104 | 580-24-111 | PresolicitationTexasDue Oct 13, 2026
- AOML HVAC and BAS Controls Upgrade ProjectFloridaDue Sep 29, 2026
- Replace Pharmacy Compounding Room FloorDue Oct 2, 2026