Civic AI
Civic AI
Procurement intelligence
SAM.gov1240LT26Q0099
Open

UTE Look Tower Reroof

Response deadline
Aug 14, 2026
Due in 20 days
Date posted
Jul 21, 2026

Description

This project consists of the reroofing of the historic UTE Tower on the Ashley National Forest. B. Work includes: 1. Remove and dispose of existing cedar wood shingle roofing system. 2. The existing plywood sheathing to remain. 3. Remove & reinstall the lightning protection rod, lightning protection cables across the roof, clamps & fasteners across the roof, and appurtenances across the roof. 4. Install a multi-width synthetic cedar shingle roofing system as specified in Specification Section 073129 SYNTHETIC CEDAR SHINGLES, and as per manufacturer’s instructions, to include matching synthetic cedar ridge caps on each of the 4 ridges. 5. Work includes the installation of the roofing felt and self-adhering ice shield underlayment over the entire roof, the flashing, the synthetic shingles, the synthetic ridge caps, and all necessary fasteners and accessories. Flashing shall be galvanized steel, no sheen, mill finish. 6. Metal Work: Fabricate and install a matching stove pipe sleeved flashing piece, to match existing material and dimensions. Within that new sleeved flashing piece, reinstall the salvaged stove pipe w/ flashing to match

Classifications

Documents (7)

  • C04a - Schedule of Items - 1240LT26Q0099.pdf
    .pdf223 KBNot yet available
  • C04 SF1442 - 1240LT26Q0099 - Final.pdf
    .pdf491 KBNot yet available
  • C04d - Experience Questionnaire - 1240LT26Q0099.docx
    .docx33 KBNot yet available
  • C04b - Drawings - UTE TOWER - 1240LT26Q0099.pdf
    .pdf2.6 MBNot yet available
  • C04c - SOW - SPECS- 1240LT26Q0099.pdf
    .pdf408 KBNot yet available
  • C04e WD UT20260079 - 5-18-2026 1240LT26Q0099.txt
    .txt12 KBNot yet available
  • C04f - Past Performance Data Sheet 1240LT26Q0099.docx
    .docx14 KBNot yet available

Contacts

Similar contracts

Explore more