SUMMIT VIEW WATER SYSTEM PIPE REPLACEMENT
- Response deadline
- Jul 30, 2026 Closed
- Date posted
- Jul 20, 2026
- Source
- Open notice
Description
Summit View Water System Replacement Montpelier Ranger District of the Caribou-Targhee National Forest Bear Lake County, Idaho Posting: 7/20/2026 Site Visit: Contact COR for Access Q&A Due Date: 07/27/2026 Quotes Due Date: 07/30/2026 Anticipated Award Date: 08/05/2026 This project includes the replacement of waterline originating at Thompson Spring and servicing the Summit View Campground to be preformed IAW documentation and specifications attached. The work includes removing and replacing approximately 1770 feet of waterline, from the sheep trough T to the iodinator. Replacement includes 2” minimum diameter HDPE waterline, pipe zone bedding, utility locating system, an air release valve, drains, and backflow preventer, along with incidentals like heat fusion joints and trenching. Quantities associated with these options are identified in the Schedule of Items. The project is located on the Montpelier Ranger District of the Caribou-Targhee National Forest, Bear Lake County, Idaho, in Section 15, T 10 S, R 44 E. It is located approximately 20 miles North of Montpelier, Idaho. The project may be accessed from State Highway 30 and Left-Hand Georgetown Canyon Road (42.5528° N, 111.2957° W). Firm Fixed Price Contract Price Range $40,000.00k - $60,000.00 Questions should be directed to the COR: Mary Jenkins mary.jenkins@usda.gov
Classifications
Documents (7)
- C04f - Past Performance Data Sheet.pdf.pdf76 KBNot yet available
- C04c_Drawings Summit Complete Package Signatures.pdf.pdf8.0 MBNot yet available
- C04_1240LT26Q0136_RFQ.pdf.pdf630 KBNot yet available
- C04a_Schedule of Items.xlsx.xlsx12 KBNot yet available
- C04b_Specifications.pdf.pdf484 KBNot yet available
- C04d_SAM_Wage Determination_ID20260021 051820.pdf.pdf41 KBNot yet available
- C04e - Experience Questionnaire.pdf.pdf189 KBNot yet available
Contacts
Similar contracts
- REPAIR SOUTH POST RESERVOIRSDue Sep 17, 2026
- MSD Infrastructure Repairs Phase 2Due Sep 24, 2026
- FY26 Medical University of South Carolina (MUSC) Pump UpfitDue Sep 8, 2026
- Y--2026 MARCOTT COULEE PIPELINEDue Sep 10, 2026
- J045--Terminate - Isolate 8-inch Steam PipelineDue Aug 19, 2026
- GATE-REPAIR C-LOT PUMP STATION-SHUDue Aug 27, 2026