SAM.gov1240LT26Q0120
Open
Silver Lake Restroom Roof Replacement
AGRICULTURE, DEPARTMENT OF · UT
- Response deadline
- Aug 10, 2026 Due in 24 days
- Date posted
- Jul 15, 2026
- Source
- Open notice
Description
This project consists of removing and replacing the Silver Lake restroom timber framed roof structure that was damaged in the winter of 2023. Work includes the removal of existing roof framing, protecting in place all existing amenities, disconnecting, salvaging, reinstalling all ceiling mounted electrical, and reconstructing the roof as shown on the plans and in the specifications.
Classifications
Documents (5)
- C04 WD Salt Lake County UT 1240LT26Q0120.pdf.pdf63 KBNot yet available
- C04 SOW 1240LT26Q0120.docx.docx120 KBNot yet available
- C04 Drawings 1240LT26Q0120.pdf.pdf2.1 MBNot yet available
- C04 1240LT26Q0120.pdf.pdf302 KBNot yet available
- 1240LT26Q0120 amendment.pdf.pdf294 KBNot yet available
Contacts
- Derrick A Dodson
- Jason Day