SAM.gov1240LT26Q0120
Open
Silver Lake Restroom Roof Replacement
- Response deadline
- Aug 10, 2026 Closed
- Date posted
- Jul 15, 2026
- Source
- Open notice
Description
This project consists of removing and replacing the Silver Lake restroom timber framed roof structure that was damaged in the winter of 2023. Work includes the removal of existing roof framing, protecting in place all existing amenities, disconnecting, salvaging, reinstalling all ceiling mounted electrical, and reconstructing the roof as shown on the plans and in the specifications.
Classifications
Documents (5)
- C04 WD Salt Lake County UT 1240LT26Q0120.pdf.pdf63 KBNot yet available
- C04 SOW 1240LT26Q0120.docx.docx120 KBNot yet available
- C04 Drawings 1240LT26Q0120.pdf.pdf2.1 MBNot yet available
- C04 1240LT26Q0120.pdf.pdf302 KBNot yet available
- 1240LT26Q0120 amendment.pdf.pdf294 KBNot yet available
Contacts
Similar contracts
- FMC Lexington - Remove and Replace Treadway RoofKentuckyDue Dec 9, 2026
- Fenn Ranger Station roofing replacementIdahoDue Nov 19, 2026
- Z--Slv-Cb Pumping Plant RoofColoradoDue Nov 16, 2026
- RF Roof Replacement ProjectNew JerseyDue Dec 10, 2026
- Roof Assessment and Repair at the Albuquerque Area Indian Health Service Healthcare FacilitiesNew MexicoDue Dec 4, 2026
- Ny Montezuma Nwr Main Shop RoofDue Nov 23, 2026