USS BOXER (LHD-4), ALCO Model 251C Long Lead Time Material (LLTM) Replacement
- Response deadline
- Jul 1, 2026 Closed
- Date posted
- Jun 24, 2026
- Source
- Open notice
Description
RFP Amendment 0001 is hereby posted to update the Product Description (Attachment J-1), see attachment. This is a Combined Synopsis/Solicitation for commercial products prepared in accordance with the format in Part 12. This announcement constitutes the only solicitation. A proposal is being requested from only one source. Request for Proposal (RFP) N5523626R009 is issued as a sole source procurement. The subject solicitation is being processed in accordance with FAR Part 12. The Government intends to solicit and contract with only one source, Fairbanks Morse Defense (referred to herein a s Fairbanks Morse) for the part listed on the Product Description (Attachment J-1), under the authority of FAR 12.102 on a sole source basis. This notice of intent is not a request for competitive proposals. Determination by the Government not to compete with this proposed contract based upon responses to this notice is solely within the discretion of the Government. The applicable North American Industry Classification System (NAICS) code is 333618 ? Other Engine Equipment Manufacturing. This solicitation incorporates provisions and clauses by reference. The full text of FAR and DFAR references, provisions and clauses may be accessed at https://acquisition.gov. Please see the attachment, 26R0009__USS_Boxer_RFP_Syn_Sol for the full combined solicitation/synopsis notice for this requirement.
Classifications
Documents (1)
- attachmentNot yet available
Contacts
- kristin.j.liljestrom.civ@us.navy.mil619-708-3630
- miramaje.c.brown.civ@us.navy.mil(619) 708-0826
Similar contracts
- Injector Assembly, FuelDue Nov 20, 2026
- Air Cleaner, IntakeDue Nov 16, 2026
- Governor, Diesel EngineDue Nov 16, 2026
- Insert, Heat ExchangDue Nov 16, 2026
- Filter Element, FluidDue Nov 20, 2026
- Filter Element, IntakeDue Nov 16, 2026