USACE SPK Construction - Natomas PP5, Sacramento, CA
- Response deadline
- Sep 29, 2026 Due in 42 days
- Date posted
- Aug 18, 2026
- Source
- Open notice
Description
*** Amendment 0003 has been issued****** Amendment 0002 has been issued****** Amendment 0001 has been issued ***The United States Army Corps of Engineers (USACE) Sacramento District (SPK) is issuing a solicitation for the requirement to construct a new pumping plant facility in Sacramento, CA. The American River Common Features, Natomas Basin Project was authorized by the Water Resources Reform Development Act of 2014. The Natomas Basin is divided into nine reaches, A through I. Pumping Plant 5 (PP5) is in Reach B, located along the Sacramento River near the landside toe of the levee and south of Interstate 5. PP5 is designed to discharge drainage from the West Drainage Canal to the Sacramento River following any significant amount of rainfall. The existing PP5 is in the path of completing the Reach B levee improvements that includes seepage berm, adjacent levee, and raising discharge pipes above the 200-year water surface elevation. The existing PP5 will be demolished, and a new facility will be constructed about 300 feet up the canal to allow for the levee features to be constructed .Point of Contact: Antonina Beal, Contract Specialist. Email: Antonina.Beal@usace.army.mil. Please refer to the full solicitation document for all detailed instructions, clauses, and submission requirements.
Classifications
Documents (1)
- attachmentNot yet available
Contacts
Similar contracts
- 127EAW26Q0037 - Dark Canyon Culvert RepairCaliforniaDue Aug 25, 2026
- 27-30 Inch Maintenance Dredging within the Geographical Boundaries of USACE Mobile DistrictDue Aug 20, 2026
- FY26 MOTSU BermsDue Aug 24, 2026
- Z2LZ--528A7-25-502 Replace Trench DrainsDue Aug 24, 2026
- Maintenance Dredging at Various Locations, Tyndall AFB, FLDue Sep 2, 2026
- USACE SPK DBB Construction - Natomas Reach I Contract 2 - Sacramento, CADue Sep 10, 2026