SAM.govW9127826BA003
Open
Unit Price Contract for Maintenance Dredging of Pensacola Harbor Entrance Channel
- Response deadline
- Oct 13, 2026 Due in 32 days
- Date posted
- Sep 11, 2026
- Source
- Open notice
Description
The requirement will be for hydraulic cutterhead pipeline dredges, trailing suction hopper dredges, and/or mechanical dredges with scows. Dredges must be capable of dredging to a depth of 39 feet and be complete with crew, management staff and support equipment including tugs and various other floating plants as would normally be expected to support a large dredging operation. The material type expected for this requirement will be maintenance material typical for Pensacola Entrance Channel composed of sand. Material dredged will be placed west of the Pensacola Entrance Channel along Perdido Key Beach. The maximum pumping distance for beach placement will be approximately 30,000-feet.
Classifications
Documents (1)
- attachmentNot yet available
Contacts
Similar contracts
- Barataria Bay Waterway, Maintenance Dredging, Bar ChannelLouisianaDue Sep 16, 2028
- Y--LARO 258755 - Replace Dilapidated Docks and Fuel System, and Rehabilitate Parki
- Y--NOAA/USCG Cutter STORIS Homeporting ProjectDue Oct 16, 2026
- USACE SPK DBB Construction - Natomas Reach I Contract 2 - Sacramento, CACaliforniaDue Sep 16, 2026
- Assunpink Creek Site 8 Dam Rehab – NRCS-New JerseyNew JerseyDue Sep 21, 2026
- Tenkiller Replace Service GatesOklahomaDue Sep 25, 2026