Y1BG--EHRM Infrastructure Upgrades Construction - Kerrville - Project 671A4-21-700
- Response deadline
- Jun 30, 2026 Closed
- Date posted
- Jun 15, 2026
- Source
- Open notice
Description
Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for EHRM INFRASTRUCTURE UPGRADES as required by drawings and specifications. Project scope includes, but is not limited to, the following infrastructure upgrades: Electrical (electrical panel upgrade, power [normal, emergency]); Bonding; UPS; Building Management System interfaces; new/upgraded existing HVAC; reconfiguration, expansion, and renovation of existing space (demo, new construction, finishes, cable); space renovation for Data Center (expanded space, cable management, server rack configuration); communications infrastructure (new Data outlets, patch panels, upgrade to Cat 6A cable) in buildings as necessary; physical security upgrades; upgrade fiber infrastructure backbone campus-wide within buildings and between buildings; provide diversified path for WAN; and Hazardous Materials abatement. Project buildings include 1, 2, 11, 18, 29, 46, 96 and site.
Classifications
Documents (21)
- Download36C77626B0019 - 4-21-26.pdf.pdf885 KB
- DownloadSection 28 13 00 Physical Access Control System Updated 4-30-26.pdf.pdf645 KB
- DownloadATTACHMENT 7 - Construction Wage Rates - Kerr 1-2-26.pdf.pdf57 KB
- DownloadATTACHMENT 8 - Site Visit Instructions.pdf.pdf574 KB
- DownloadC - 52.222-90 Addressing DEI Discrimination by Federal Contractors - APR 2026.pdf.pdf87 KB
- DownloadATTACHMENT 2 - Drawings Updated 4-27-27.pdf.pdf50.0 MB
- DownloadATTACHMENT 5 - Infection Control Risk Assessment.pdf.pdf514 KB
- DownloadATTACHMENT 3 - Asbestos Report.PDF.pdf26.7 MB
- DownloadATTACHMENT 1 - Specifications.pdf.pdf38.0 MB
- Download36C77626B0019 0001.pdf.pdf198 KB
- Download36C77626B0019 0003.pdf.pdf145 KB
- DownloadET701 Legible Version.pdf.pdf1.0 MB
- DownloadSite Visit Sign-in Sheet - Kerrville EHRM 4-30-26.pdf.pdf335 KB
- Download36C77626B0019 0004.pdf.pdf147 KB
- Download36C77626B0019 0002.pdf.pdf194 KB
- DownloadSection 01 32 16.15 Project Schedules Updated 6-10-26.pdf.pdf732 KB
- DownloadATTACHMENT 7 - Construction Wage Rates - Kerr 5-18-26.pdf.pdf63 KB
- DownloadATTACHMENT 4 - Pre-Construction Risk Assessment.pdf.pdf376 KB
- DownloadTechnical Questions Responses - Kerrville EHRM - 6-15-26.pdf.pdf370 KB
- DownloadATTACHMENT 6 - Limitations on Subcontracting - Construction.docx.docx18 KB
- DownloadATTACHMENT 2 - Drawings.pdf.pdf42.9 MB
Contacts
- Thomas Councilthomas.council@va.gov(216) 447-8321
- Donald A. Marsh IIIdonald.marsh2@va.gov216-447-8321