EHRM Infrastructure Upgrades Construction - Kerrville - Project 671A4-21-700
- Response deadline
- Jun 9, 2026 Closed
- Date posted
- Apr 21, 2026
- Source
- Open notice
Description
Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for EHRM INFRASTRUCTURE UPGRADES as required by drawings and specifications. Project scope includes, but is not limited to, the following infrastructure upgrades: Electrical (electrical panel upgrade, power [normal, emergency]); Bonding; UPS; Building Management System interfaces; new/upgraded existing HVAC; reconfiguration, expansion, and renovation of existing space (demo, new construction, finishes, cable); space renovation for Data Center (expanded space, cable management, server rack configuration); communications infrastructure (new Data outlets, patch panels, upgrade to Cat 6A cable) in buildings as necessary; physical security upgrades; upgrade fiber infrastructure backbone campus-wide within buildings and between buildings; provide diversified path for WAN; and Hazardous Materials abatement. Project buildings include 1, 2, 11, 18, 29, 46, 96 and site.
Classifications
Documents
No documents posted for this opportunity.
Similar contracts
- Fy27 MaccSouth CarolinaDue Nov 4, 2026
- JB Charleston Multiple Award Construction ContractSouth CarolinaDue Nov 2, 2026
- Saber Fy 27-32Due Nov 6, 2026
- (EAR048) Repair Fire Alarm System Eareckson Air Station FacilitiesAlaskaDue Nov 16, 2026
- 122FW - Fort Wayne, IN - Munitions Storage Area Construction
- 590-27-120 Replace Pneumatic Tube SystemVirginiaDue Dec 16, 2026