EHRM Infrastructure Upgrades Construction - Kerrville - Project 671A4-21-700
- Response deadline
- Jun 9, 2026 Closed
- Date posted
- May 4, 2026
- Source
- Open notice
Description
Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for EHRM INFRASTRUCTURE UPGRADES as required by drawings and specifications. Project scope includes, but is not limited to, the following infrastructure upgrades: Electrical (electrical panel upgrade, power [normal, emergency]); Bonding; UPS; Building Management System interfaces; new/upgraded existing HVAC; reconfiguration, expansion, and renovation of existing space (demo, new construction, finishes, cable); space renovation for Data Center (expanded space, cable management, server rack configuration); communications infrastructure (new Data outlets, patch panels, upgrade to Cat 6A cable) in buildings as necessary; physical security upgrades; upgrade fiber infrastructure backbone campus-wide within buildings and between buildings; provide diversified path for WAN; and Hazardous Materials abatement. Project buildings include 1, 2, 11, 18, 29, 46, 96 and site.
Classifications
Documents
No documents posted for this opportunity.
Similar contracts
- Design-Build of USA Pavilion at Riyadh, Saudi Arabia Expo 2030 - Request for Information - Market ResearchDue Nov 11, 2026
- SABER V Hill AFBDue Nov 5, 2026
- Building 262 Renovation, FLETC Glynco, GeorgiaGeorgiaDue Nov 9, 2026
- JB Charleston Multiple Award Construction ContractSouth CarolinaDue Oct 28, 2026
- 561-26-103 Upgrade Electrical and Plumbing in Building 18BNew Jersey
- Minor Construction / Sustainability, Repair and MaintenanceOklahomaDue Nov 9, 2026