WIN CP2000834 26CSP007 Re-Roof and Building Enclosure Repairs
- Response deadline
- Sep 22, 2026 Closed
- Date posted
- Aug 10, 2026
- Source
- Open notice
Description
F.L. Winship Drama Bldg. (WIN) Replace approximately 50,000 square feet of roofing on all roof elevations of the Winship building, with the exception of the sky light roof area, using a two-ply modified bitumen roofing system backed by a 25 -year manufacturer’s warranty. Modify all MEP (Mechanical,Electrical,and Plumbing) disciplines as indicated in the sealed construction documents and perform structural roof deck repairs as required. Additionally, complete the following exterior building improvements: • Replace approximately 4,000 square feet of windows on the 1960 building elevations. • Repair damaged limestone. • Repair damaged masonry and repoint all cracked and/or missing mortar joints on the exterior masonry walls of both the 1960 and 1974 building sections. • Install fall protection systems as specified in the sealed construction drawings. • Preform hazardous materials abatement for all applicable aspects of the project in accordance with the project’s specifications and regulatory requirements. Preform pre-tab and post tab of all mechanical equipment in the construction drawings and project specifications. All work shall be completed in accordance with the sealed construction documents, applicable building codes, manufacturer’s requirements, and all governing regulations.
Classifications
- NAICS90922
Documents (6)
- ESBD_547988_1786374044508_Link to RFP WIN CP2000834 26CSP007.pdfNot yet available
- ESBD_547988_1786374124952_Exhibit H with SP and PAR (0526).pdfNot yet available
- ESBD_547988_1786374247752_Link to Drawings WIN CP2000834 26CSP007.pdfNot yet available
- media.nlNot yet available
- ESBD_547988_1787229879562_Preproposal sign in 26CSP007.pdfNot yet available
- ESBD_547988_1788535497288_Link to Addendum No 1 26CSP007.pdfNot yet available
Contacts
- lana@austin.utexas.edu(512) 232-7037
Similar contracts
- TCSG-441-CM Gwinnett Technical College North Fulton Campus ExpansionGADue Oct 29, 2026
- CON 2651 CHES Classroom Buildout Notice of SettlementCODue Oct 14, 2026
- CON 2541 Fire Training Garage Notice of SettlementCODue Oct 14, 2026
- EMS Building & Facilities Shop CMAR ServicesGADue Oct 29, 2026
- TCSG-421, Hugh M. Gillis Building Expansion, Southeastern Technical College Vidalia CampusGADue Oct 27, 2026
- Radio Tower & Building, Ranger Hill - BWDTXDue Nov 3, 2026