OpenGov / IonwaveHCDD1-26-019-07-21-MDB
Open
South Lateral Drain Phase III - 2018 Bond Referendum Project No. 34
- Response deadline
- Aug 12, 2026 Due in 17 days
- Date posted
- Jul 25, 2026
- Source
- Open notice
Description
The project consists of the regrading, reconstruction, widening, and realignment of existing drainage ditches; installation of culvert crossings and storm drain structures; and construction of waterline and irrigation crossing improvements within the project limits. Engineer's Estimate: $6.8 - $7.2 million
Documents
No documents posted for this opportunity.