RFP 27-0026 North Kuehler Interceptor Segment 3 Phase I
- Response deadline
- Jul 23, 2026 Due in 5 days
- Date posted
- Jun 25, 2026
- Source
- Open notice
Description
The Project is anticipated to include some or all of the following items within its scope: (i) construction of 2,030 linear feet (“LF”) of 27-inch gravity sewer main by open cut construction; (ii) construction of 410 LF of 27-inch gravity sewer main with 48-inch steel casing by trenchless methods; (iii) construction of 571 LF of 15-inch gravity sewer main by open cut construction; (iv) construction of 180 LF of 15-inch gravity sewer main with 36-inch steel casing by trenchless methods across Union Pacific Railroad Right of Way; (v) construction of new manholes; (vi) abandonment and grout filling of existing sanitary sewer mains and associated manholes; (vii) connections to the NBU sanitary sewer system; (viii) sewer bypass pumping for construction; (ix) traffic control; (x) storm water pollution prevention; (xi) restoration; and (xii) all other appurtenances necessary to complete the Project.
Documents
No documents posted for this opportunity.