RFP 26-1392 EWCRWS Infrastructure and Expansion - Trinity Well and Phase 1D Project
- Response deadline
- Nov 3, 2026 Due in 34 days
- Date posted
- Aug 3, 2026
- Source
- Open notice
Description
The BRA is soliciting sealed proposals for the EWCRWS Infrastructure and Expansion The “1B1D PROJECT” represents two critical expansion improvements to the Brazos River Authority’s (BRA) East Williamson County’s Regional Water System Water Treatment Plant (EWCWTP); Phase 1B and Phase 1D. The Phase 1B Trinity Well Infrastructure Improvements will use cooling towers to treat up to 4 MGD of groundwater from the existing Trinity Well #1 for blending with treated surface water from Granger Lake. Trinity Well #1 is located on the campus of the EWCWTP. Additionally, Phase 1B work located at the EWCWTP includes significant chemical monitoring and distribution systems, stormwater system, upgrades to electrical and automation, and access road improvements that provide future buildout resilience. Phase 1B has schedule priority . The Phase 1D Short-term Expansion continues improvements at the EWCWTP to treat up to 13 MGD of additional surface water from Granger Lake by expanding raw water pumping capacity, upgrading storage reservoir inlets, outlets, and pumping capacity, upgrades to existing chemical systems, upgrades to electrical and automation systems, new rapid mix system, two new clarifiers, modify piping at four existing filters, four new additional filter systems, new backwash basin demolition of existing components and structures being replaced or removed, an additional 4.25 MG of finished water storage capacity for storage of blended treated groundwater (from Phase 1B) with treated surface water (from Phase 1D), and access road improvements. Phase 1D also includes a new medium service pump station for transmission of the finished water to the BRA’s existing and potential new customers, while providing future buildout resilience for longer term expansion.
Classifications
- NAICS15500
Documents (12)
- ESBD_545166_1785800787830_RFP No. 26-1392 EWCRWS 1B1D Projects_final.pdfNot yet available
- ESBD_545166_1785800787830_2_VOL1_1B Specs-v2 Updated.pdfNot yet available
- ESBD_545166_1785800787830_3_VOL2_1D Specs-v2 Updated.pdfNot yet available
- ESBD_545166_1785800787830_Attachment 1_1B1D_DWGS-v1_reduced.pdfNot yet available
- ESBD_545166_1785800787830_TXDOT Files July 2026.pdfNot yet available
- ESBD_545166_1786721811232_Addendum No. 1_RFP 26-1392_modify schedule.pdfNot yet available
- ESBD_545166_1787088288474_PreProposal MTG RFP 26-1392_Aug18_10AM.pdfNot yet available
- ESBD_545166_1787088289279_PreProposal MTG RFP 26-1392_Aug18_1PM.pdfNot yet available
- ESBD_545166_1788366382299_Addendum No. 6 RFP 26-1392 1B1D Projects_Add Site Visits_Q&A.pdfNot yet available
- ESBD_545166_1788366583473_PreProposal MTG RFP 26-1392_Aug20_10AM.pdfNot yet available
- ESBD_545166_1788366737021_PreProposal MTG RFP 26-1392_Aug20_1PM.pdfNot yet available
- ESBD_545166_1789763875161_Addendum No. 7 RFP 26-1392_Replace clarifier specs.pdfNot yet available
Contacts
- allison.sheeler@brazos.org(254) 761-3153
Similar contracts
- Permanent Modular Buildings JOCTXDue Oct 16, 2026
- Modular Buildings, Shelters, and StructuresTXDue Jul 30, 2026
- Health and Wellness Medical/Rx, Dental, FSA, HRA and COBRA Insurance ServicesTXDue Oct 6, 2026
- RFB No. 26-1399 Landscape and Mowing ServicesTXDue Oct 8, 2026
- Hydrostatic Pressure Relief System Assessment and Downstream River Channel Improvements at Sterling C. Robertson DamTXDue Oct 14, 2026
- Solid Waste Collection and Disposal Services at Possum KingdomTXDue Aug 27, 2026