Repair Carswell Ave.
- Response deadline
- Jul 17, 2026 Due in 0 days
- Date posted
- Jul 7, 2026
- Source
- Open notice
Description
Multiple issues have developed along Carswell Street that have needed repairs, modifications, and additions to stabilize the road and minimize water ponding, potholes and other surface improvements that made the road unsafe for driving conditions. For more details regarding the project, refer to attachment: D2 - Phase III SOW AMENDMENT 1 This amendment is to add the attachment: Carswell Site Visit Location, to the list of attachments. As a reminder if you plan on attending the site visit all attendees MUST have base access. If personel does not have base access they MUST fill out the UAR form found in the attachment list and submit to both POC's listed for this solicitation. AMENDMENT 2 This amendment is to add the attachment: Jul 1 Site Visit Sign In Sheet
Classifications
Documents (12)
- DownloadSolicitation - FA301626B0001.pdf.pdf600 KB
- DownloadAppendix A- Specification.pdf.pdf3.0 MB
- DownloadBlank UAR.pdf.pdf29 KB
- DownloadCarswell Site Visit Location.pdf.pdf343 KB
- DownloadAppendix F- Geotech report..pdf.pdf2.5 MB
- DownloadWage Determination Pub 5-18-26.pdf.pdf63 KB
- DownloadAppendix E- IFC Drawings.pdf.pdf50.0 MB
- DownloadE4 - Utility_Map.pdf.pdf4.5 MB
- DownloadD3 - Submittal Register.pdf.pdf98 KB
- DownloadJul 1 Site Visit Sign In Sheet.pdf.pdf499 KB
- DownloadD2 - Phase III SOW.pdf.pdf316 KB
- DownloadAppendix D-Design Analysis.pdf.pdf760 KB
Contacts
- Deshawn Smithdeshawn.smith.4@us.af.mil3804594682
- Francisco MARTINEZ MARTINEZfrancisco.martinez_martinez.1@us.af.mil9184063085