Remove and Install Vinyl Composite Tile (VCT) Flooring BLDG 1001
- Response deadline
- Jun 17, 2026 Closed
- Date posted
- May 14, 2026
- Source
- Open notice
Description
The project consists of removing the current flooring and providing durable, long-lasting vinyl flooring for high- traffic areas within rooms 114, 115,116, 117, 118, 119, 120,122, and 124 located in building 1001. The work includes demolition of existing flooring, proper handling and disposal of materials in accordance with environmental requirements, preparation of the concrete subfloor, and installation of new flooring. Replacement includes 4� inch vinyl base with toe throughout all designated rooms. Install new vinyl flooring in eight (8) rooms measuring 11 ft X 16 ft and one (1) room measuring approximately 12 ft X 37 ft (approx. 1,500 sq ft total for all rooms). Contract is responsible for moving all furniture as required for flooring removal and installation.
Classifications
Documents
No documents posted for this opportunity.
Similar contracts
- Epoxy Floor Coating, Cold Regions Research and Engineering Laboratory, Hanover, NHNew HampshireDue Sep 2, 2026
- Y1DZ--Castle Point PT Flooring ReplacementDue Sep 7, 2026
- SLD 30/SE, B7015, Carpet Removal/InstallationCaliforniaDue Sep 1, 2026
- Replace Flooring at USCG Base New Orleans Administrative BuildingLouisianaDue Aug 27, 2026
- Carpet InstallationVirginiaDue Aug 28, 2026
- FLOOR COATING APPLICATIONDistrict of ColumbiaDue Sep 4, 2026