KIN CP2001827 27CSP001 North Tower Rm Renovations
- Response deadline
- Nov 13, 2026 Closed
- Date posted
- Oct 12, 2026
- Source
- Open notice
Description
This project includes 10 non-ADA Jack and Jill suites, 3 single rooms with attached bathroom, 2 accessible Jack and Jill suites with roll-in showers, 1 accessible Jack and Jill suite with a transfer shower, 1 single accessible room with attached bathroom with a roll-in shower, and 1 single accessible room with attached bathroom with a transfer shower on Level 1 at the North Tower. This project consists of the following: Demolition of flooring, walls, plumbing fixtures, wall and floor tile, doors, built-in furniture, and ceilings of 9 rooms and 5 bathrooms on Level 1 as well as doors at Rooms 158 and 160, where walls within suite were previously demolished to become fully ADA/TAS compliant accessible rooms and suites as described above. New work to include new walls, doors, plumbing re-build to tie into new chase walls, plumbing fixtures, and toilet accessories at new accessible suites as described above. All 32 rooms in scope to receive new flooring, base, paint, HVAC pony wall surround, sink and faucet in cabinet, tackboards, paint, and drywall where indicated. Power is existing and will be connected to new devices within 6’ of original location. New Lounge at North Tower Entry will be incorporated, capturing demolished resident room 152 to provide an accessible route from ground level to Level 1 resident rooms with the incorporation of a pit-free, ramp-free, electric chair lift. A small slab addition will be incorporated to infill a small area adjacent to the new chair lift location for acontinuous floor at the new Lounge 152.
Classifications
- NAICS90921
Documents (6)
- ESBD_566896_1791828350728_RFP KIN CP2001827 27CSP001.pdfNot yet available
- ESBD_566896_1791828477482_Link to Drawings 27CSP001.pdfNot yet available
- ESBD_566896_1791828536672_Exhibit H with SP and PAR (0526).pdfNot yet available
- ESBD_566896_1792504671952_Preproposal Sign In Sheet 27CSP001.pdfNot yet available
- media.nlNot yet available
- ESBD_566896_1792504950336_Link to 27CSP001 Virtual Tour ppt.pdfNot yet available
Contacts
- lana@austin.utexas.edu(512) 232-7037
Similar contracts
- 761/19006.SAR; NuWay Cleaners Site - Remedial ExcavationMIDue Nov 18, 2026
- 472/23129.KMM; Woodland C.F. - Site Mechanical UndergroundMIDue Nov 18, 2026
- 472/26279.JLM; Lakeland C.F. - Softener & Salt Storage UpgrdMIDue Nov 25, 2026
- 751/22413.CTS; Bay City State Park Campground ImprovementsMIDue Nov 18, 2026
- 171/23125.CTS; Jerome Hart Building - Chilled Water UpgradesMIDue Nov 18, 2026
- 751/22413.CTS; Bay City State Park Campground ImprovementsMIDue Nov 18, 2026