Fire suppression system installation
- Response deadline
- Aug 7, 2026 Due in 21 days
- Date posted
- Jul 13, 2026
- Source
- Open notice
Description
Due to a recent fire in building 6418 at Moore Air Base, Texas, a wet fire suppression system is needed. Building 6418 was constructed in the early 1980s with no fire suppression initially. Contractor shall provide design/as-built drawings submittals and installation of a new retrofitted system. The system shall be a turnkey project encompassing everything needed to have a fully functioning fire suppression system. Solicitation documents are posted below. NOTE: For those wishing to attend the site visit, please send names of attendees to james.g.roloff@usda,gov. A valid drivers license or state ID is required. Amendment 1 is posted below. RFI: Does Building 6418 currently have an existing fire alarm panel/system that the sprinkler monitoring would tie into? If so, could you please provide the panel/system type, make/model, or any available details needed for a sprinkler monitoring quote? The fire panels are old and obsolete. They will be replaced at another time, but the new sprinkler system must be able to connect to a fire panel in the future. No monitoring is needed.
Classifications
Documents (4)
- 12639526Q0210-0001.pdf.pdf196 KBNot yet available
- Attachment 1_Statement of Work.docx.docx42 KBNot yet available
- 12639526Q0210.docx.docx80 KBNot yet available
- Attachment 2_Federal Construction Wage Rates_Hidalgo County.txt.txt13 KBNot yet available
Contacts
- Jim Roloffjames.g.roloff@usda.gov6125907603