B-52J Commercial Engine Replacement Program Airfield Runway/Taxiway Light Removal and Replacement
- Response deadline
- Jun 5, 2026 Closed
- Date posted
- May 29, 2026
- Source
- Open notice
Description
The contractor shall provide all personnel, equipment, tools, materials, supervision and all other items or services necessary to perform the requirements as described in this Statement of Work (SOW) at JBSA Lackland, Kelly Airfield, TX. Replace the raised lights/signs after the B-52 taxis or is towed to the runway as defined in this SOW. Contractor shall be responsible for ensuring the B-52 has access to Boeing from the runway and ensure the lights/signs are restored back to original condition. The runway and taxiway lights and signs, as described in this SOW, are included in this contract. Attachment 1 - BPA B52 Runway Lighting SOW 11 May 26 Attachment 2 - SCA WD 2015-5253 Rev 29 - 30 Apr 26 Attachment 3 - PoSA Runway - Taxiway Lights and Signage Attachment 4 - Schedule B B-52 CERP Airfield Lighting BPA Price List Attachment 5 - Combined Q and A - FA301626Q0118 29 May 26 Proposal Due: Friday, 05 June 2026 at 11:00 AM, CDT
Classifications
Documents
No documents posted for this opportunity.
Similar contracts
- Triennial Circuit Breaker and Feeder TestingDue Nov 9, 2026
- Fernan Ranger Station lift station electrical repairIdahoDue Oct 22, 2026
- 657A5-26-111, Triennial Electrical TestingIllinoisDue Nov 9, 2026
- 541 Electrical Power Distribution Equipment Testing, Inspection, and Maintenance - VAMC ClevelandOhioDue Oct 23, 2026
- Tv Digital ConversionDistrict of ColumbiaDue Oct 20, 2026
- Solicitation for Spokane Cabling. Combination of Firm Fixed Price and Time and Material Services ContractWashingtonDue Oct 27, 2026