13 ACSC 3D Metal Printer
- Response deadline
- Jul 9, 2026 Closed
- Date posted
- Jun 29, 2026
- Source
- Open notice
Description
Xact Metal 200G Metal 3D Printer System (With Installation and OEM OnSite Training) Complete metal powder bed fusion 3D printing system, including physical delivery, onsite installation, OEMled operator training, and operational verification. System shall be configured and supplied with: Laser Configuration: Single (1) 400-Watt Laser Build Height: Extended Build Height (11.5") Reactive Enabled: Supports safe processing of aluminum and other reactive metals Glove Box: Integrated powderhandling glove box. Sieving Station: OEM powder sieving station for material reclamation. Safety Equipment: Specialized metal powder vacuum for safe cleaning and mitigation of inhalation/combustion hazards. Installation Services: Onsite unboxing, physical setup, utility connection, and system calibration /verification by certified OEM technicians at Fort Hood, TX. OEM-Led Training (Bundled): 2-3 days of intensive, onsite, hands-on operational and safety training at Fort Hood, TX. Training shall be scheduled and conducted only after the printer has been fully installed, calibrated, and verified as operational. Training includes system operation, powder handling, reactive metal safety, job setup, maintenance, and troubleshooting. All questions must be submitted in writing to the POCs listed below no later than 11:59 pm (CST), 6 July 2026. marvin.e.hopkins4.mil@army.mil donelle.h.white.mil@army.mil jasper.l.cruz.mil@army.mil
Classifications
Documents (2)
Contacts
Similar contracts
- FDM 3D PrinterAlaskaDue Sep 4, 2026
- FDM 3D PrinterAlaskaDue Sep 4, 2026
- AdvM Call for Solutions - Automated Parts Handling for Plating in SODPennsylvaniaDue Sep 9, 2026
- Ink PumpsDistrict of ColumbiaDue Sep 8, 2026
- AdvM Call for Solutions - Modernized Paint Line in SODPennsylvaniaDue Sep 9, 2026
- BEP Spare Parts # MAP2827 - SEAL BLOCK & MAP2828 - CARRIER RINGTexasDue Sep 1, 2026