Two Phase Design-Build/Design-Bid-Build (DB/DBB) Multiple Award Task Order Contract (MATOC) for Construction of the Ground Based Strategic Deterrent (GBSD) Utility Corridor (UC) at Francis E. Warren Air Force Base (FEW AFB), Wyoming (WY)
- Response deadline
- Jul 8, 2026 Closed
- Date posted
- Jun 29, 2026
- Source
- Open notice
Description
$1.7B UNR TWO-PHASE DB/DBB MATOC FOR CONSTRUCTION OF THE GBSD UTLITY CORRIDOR AT F. E. WARREN AFB, WY. Reference Section 00 00 00 Procurement and Contracting Requirements for additional not included on the SF 1442 description. The Phase Two Seed Project Specifications and Drawings contain Controlled Unclassified Information and instructions to request access to these documents are located in Section 00 00 00. Vendors must be registered in both System for Award Management and Procurement Integrity Enterprise Environment to obtain approval for access to all CUI documents and submit proposals. Reference Solicitation Section 00 22 10 for registration instructions to access these systems. Reference the Solicitation for compliance with NIST and Cybersecurity Maturity Model Certification requirements as it pertains to this acquisition.
Classifications
Documents (1)
- attachmentNot yet available
Contacts
- Brandon Landisbrandon.p.landis@usace.army.mil4029952056