Two Phase Design-Build/Design-Bid-Build (DB/DBB) Multiple Award Task Order Contract (MATOC) for Construction of the Ground Based Strategic Deterrent (GBSD) Utility Corridor (UC) at Francis E. Warren Air Force Base (FEW AFB), Wyoming (WY)
- Response deadline
- Jun 17, 2026 Closed
- Date posted
- May 18, 2026
- Source
- Open notice
Description
$1.7B UNR TWO-PHASE DB/DBB MATOC FOR CONSTRUCTION OF THE GBSD UTLITY CORRIDOR AT F. E. WARREN AFB, WY. Reference Section 00 00 00 Procurement and Contracting Requirements for additional not included on the SF 1442 description. The Phase Two Seed Project Specifications and Drawings contain Controlled Unclassified Information and instructions to request access to these documents are located in Section 00 00 00. Vendors must be registered in both System for Award Management and Procurement Integrity Enterprise Environment to obtain approval for access to all CUI documents and submit proposals. Reference Solicitation Section 00 22 10 for registration instructions to access these systems. Reference the Solicitation for compliance with NIST and Cybersecurity Maturity Model Certification requirements as it pertains to this acquisition.
Classifications
Documents
No documents posted for this opportunity.
Similar contracts
- Z--Sand Island Photovoltaic System RenovationDue Aug 28, 2026
- Power Construction and Services II (PCS II) MATOCDue Sep 8, 2026
- Y--COTP Series Capacitor Two-Phase Design BuildDue Sep 30, 2026
- XUMU 20260001A Bldg 15501 FOC Comm InstallCaliforniaDue Aug 28, 2026
- Luke AFB AUX Airfield ModernizationArizonaDue Aug 31, 2026
- XUMU 20260001 OSP Oak Mountain Fiber RelocationCaliforniaDue Aug 31, 2026