Two Phase Design-Build/Design-Bid-Build (DB/DBB) Multiple Award Task Order Contract (MATOC) for Construction of the Ground Based Strategic Deterrent (GBSD) Utility Corridor (UC) at Francis E. Warren Air Force Base (FEW AFB), Wyoming (WY)
- Response deadline
- Jun 17, 2026 Closed
- Date posted
- May 18, 2026
- Source
- Open notice
Description
$1.7B UNR TWO-PHASE DB/DBB MATOC FOR CONSTRUCTION OF THE GBSD UTLITY CORRIDOR AT F. E. WARREN AFB, WY. Reference Section 00 00 00 Procurement and Contracting Requirements for additional not included on the SF 1442 description. The Phase Two Seed Project Specifications and Drawings contain Controlled Unclassified Information and instructions to request access to these documents are located in Section 00 00 00. Vendors must be registered in both System for Award Management and Procurement Integrity Enterprise Environment to obtain approval for access to all CUI documents and submit proposals. Reference Solicitation Section 00 22 10 for registration instructions to access these systems. Reference the Solicitation for compliance with NIST and Cybersecurity Maturity Model Certification requirements as it pertains to this acquisition.
Classifications
Documents
No documents posted for this opportunity.
Similar contracts
- Request for Quotations (RFQ) - Trenching, Underground Conduit Installation and Associated Civil WorksWestern CapeDue Nov 3, 2026
- Industry Day - Sentinel Utility Infrastructure Improvements at MAFBMontanaDue Oct 19, 2026
- Power Construction and Services II (PCS II) MATOCDue Oct 27, 2026
- FCI Marion - Emergency Repair Tornado DamageIllinoisDue Dec 3, 2026
- Request for Information/Market Intelligence Notice: Microgrid Projects – Use of Progressive Design Build (PDB) with Other Transaction Authority (OTA)OklahomaDue Oct 16, 2026
- EIE490 Microreactor Synchronization, Eielson AFB, AlaskaAlaskaDue Oct 16, 2026