Two Phase Design-Build/Design-Bid-Build (DB/DBB) Multiple Award Task Order Contract (MATOC) for Construction of the Ground Based Strategic Deterrent (GBSD) Utility Corridor (UC) at Francis E. Warren Air Force Base (FEW AFB), Wyoming (WY)
- Response deadline
- Jun 2, 2026 Closed
- Date posted
- Apr 17, 2026
- Source
- Open notice
Description
$1.7B UNR TWO-PHASE DB/DBB MATOC FOR CONSTRUCTION OF THE GBSD UTLITY CORRIDOR AT F. E. WARREN AFB, WY. Reference Section 00 00 00 Procurement and Contracting Requirements for additional not included on the SF 1442 description. The Phase Two Seed Project Specifications and Drawings contain Controlled Unclassified Information and instructions to request access to these documents are located in Section 00 00 00. Vendors must be registered in both System for Award Management and Procurement Integrity Enterprise Environment to obtain approval for access to all CUI documents and submit proposals. Reference Solicitation Section 00 22 10 for registration instructions to access these systems. Reference the Solicitation for compliance with NIST and Cybersecurity Maturity Model Certification requirements as it pertains to this acquisition.
Classifications
Documents
No documents posted for this opportunity.
Similar contracts
- Power Construction and Services II (PCS II) MATOCDue Nov 3, 2026
- Y--Folsom Dam Electronic Access Control and Surveillance (EACSS) Fiber Backbone UpDue Nov 17, 2026
- USFK C4I Communication Tower and Facility Maintenance CY27Due Nov 18, 2026
- B21 Utilities & Site Improvements, Communications & Electrical Infrastructure, Dyess AFB OT Feasibility & Business FeedbackTexasDue Nov 12, 2026
- CSSC Utility Feed Transformer ReplacementDue Nov 5, 2026
- CSSC Utility Feed Transformer ReplacementDue Nov 5, 2026