Two Phase Design-Build/Design-Bid-Build (DB/DBB) Multiple Award Task Order Contract (MATOC) for Construction of the Ground Based Strategic Deterrent (GBSD) Utility Corridor (UC) at Francis E. Warren Air Force Base (FEW AFB), Wyoming (WY)
- Response deadline
- Sep 3, 2026 Due in 18 days
- Date posted
- Aug 5, 2026
- Source
- Open notice
Description
5 AUGUST 2026 UPDATE TO AMENDMENT 0007: Please note bid inquiries through 8 July 2026 have been posted to PIEE Solicitation (link below) due to known accessibility issues. $1.7B UNR TWO-PHASE DB/DBB MATOC FOR CONSTRUCTION OF THE GBSD UTLITY CORRIDOR AT F. E. WARREN AFB, WY. Reference Section 00 00 00 Procurement and Contracting Requirements for additional not included on the SF 1442 description. The Phase Two Seed Project Specifications and Drawings contain Controlled Unclassified Information and instructions to request access to these documents are located in Section 00 00 00. Vendors must be registered in both System for Award Management and Procurement Integrity Enterprise Environment to obtain approval for access to all CUI documents and submit proposals. Reference Solicitation Section 00 22 10 for registration instructions to access these systems. Reference the Solicitation for compliance with NIST and Cybersecurity Maturity Model Certification requirements as it pertains to this acquisition.
Classifications
Documents (1)
- attachmentNot yet available
Contacts
Similar contracts
- Feeder 7 RepairDue Sep 8, 2026
- SOURCES SOUGHT ANNOUNCEMENT / INDUSTRY DAY FOR SENTINEL UTILITY CORRIDOR AT MALMSTROM AIR FORCE BASE, MONTANAMontanaDue Sep 24, 2026
- AMIS DIABLO EAST RADIO TOWERTexasDue Sep 4, 2026
- Request for Information - Sentinel Utility Infrastructure, Malmstrom Air Force Base, MTMontanaDue Aug 28, 2026
- Y--Glendo-Lusk Rural Tap and Quinn Creek SubstationDue Aug 21, 2026
- Y--Stegall Substation Stage 07 Phase 01Due Aug 28, 2026