Civic AI
Civic AI
Procurement intelligence
SAM.gov36C24926R0057
Open

Z2DA--621-22-121 Renovate Bldg. 204 for Cath Lab II - Engineering

Response deadline
Aug 10, 2026
Due in 13 days
Date posted
Jul 27, 2026

Description

The James H. Quillen VA Medical Center located in Mountain Home (Johnson City), Tennessee has a requirement for Renovate Building 204 Cath Lab II in accordance with (IAW) the provided specifications and drawings. This project consists of all supervision, labor, materials, equipment, and transportation. Amendment 0001 - provides revised drawings and specs Amendment 0002 - provides Site Visit sign-in sheet Amendment 0003 - provides RFIs and responses, revised specs and drawing, cath shielding, final coordination study for reference, and an addendum summary for the drawing and spec changes. This extends proposal responses to 8/10/2026

Classifications

Documents (53)

  • 07.734_AQ732.4 - EQUIPMENT PLANS - PHASE FOUR.pdf
    .pdf3.5 MBNot yet available
  • 14.20_EE102.2.2 - PHASE 2 ENLARGED TECH FIRE ALARM PLAN.pdf
    .pdf865 KBNot yet available
  • 14.11_ED102.4.2 - PHASE 4 DEMOLITION TECH FIRE ALARM PLAN.pdf
    .pdf423 KBNot yet available
  • Contractor EMR Certification Form.docx
    .docx18 KBNot yet available
  • 14.08_ED102.3.2 - PHASE 3 DEMOLITION TECH FIRE ALARM PLAN.pdf
    .pdf512 KBNot yet available
  • 14.04_ED102.1.2 - PHASE 1 DEMOLITION TECH FIRE ALARM PLAN.pdf
    .pdf358 KBNot yet available
  • 14.24_EE102.4.2 - PHASE 4 ENLARGED TECH FIRE ALARM PLAN.pdf
    .pdf1.1 MBNot yet available
  • 14.22_EE102.3.2 - PHASE 3 ENLARGED TECH FIRE ALARM PLAN.pdf
    .pdf583 KBNot yet available
  • 00 00 00 - Specification Cover.pdf
    .pdf231 KBNot yet available
  • 14.27_EE102.5.3 - PHASE 5 ENLARGED LIGHTING TECH PLAN.pdf
    .pdf399 KBNot yet available
  • 36C24926R0057_1.pdf
    .pdf1.7 MBNot yet available
  • 07 41 13 - Insulated Metal Roof Panels.pdf
    .pdf118 KBNot yet available
  • 621-22-121 Site Visit Sign in sheet.pdf
    .pdf643 KBNot yet available
  • 13.12_MH103 - MECHANICAL ROOF HVAC PLAN.pdf
    .pdf487 KBNot yet available
  • 07.704_AF702.4 - PHASE FOUR FINISH PLANS.pdf
    .pdf3.4 MBNot yet available
  • 2026-0629 Cath Lab II - BID specs - Add 01.pdf
    .pdf14.8 MBNot yet available
  • 14.13_ED102.5.2 - PHASE 5 DEMOLITION TECH FIRE ALARM PLAN.pdf
    .pdf511 KBNot yet available
  • 23 82 00 - Convection Heating and Cooling Units.pdf
    .pdf24 KBNot yet available
  • General Conditions Breakout.xlsx
    .xlsx13 KBNot yet available
  • 28 23 00 - Video Surveillance.pdf
    .pdf355 KBNot yet available
  • 36C24926R0057 0001.pdf
    .pdf122 KBNot yet available
  • Past_Performance_Questionnaire.docx
    .docx39 KBNot yet available
  • 01 45 35 - Special Inspections.pdf
    .pdf69 KBNot yet available
  • 14.16_EE102.1.2 - PHASE 1 ENLARGED TECH FIRE ALARM PLAN.pdf
    .pdf605 KBNot yet available
  • 00 01 10 - Table Of Contents.pdf
    .pdf38 KBNot yet available
  • Price Breakout Schedule.xlsx
    .xlsx29 KBNot yet available
  • 36C24926R0057 0002.pdf
    .pdf121 KBNot yet available
  • 2026-0724 Addendum 02 Summary.docx
    .docx45 KBNot yet available
  • WD TN20260191 2 Jan 2026.pdf
    .pdf238 KBNot yet available
  • 14.26_EE102.5.2 - PHASE 5 ENLARGED TECH FIRE ALARM PLAN.pdf
    .pdf771 KBNot yet available
  • 14.38_E600 - PARTIAL SINGLE LINE DIAGRAM.pdf
    .pdf277 KBNot yet available
  • 07.730_AQ732 - OVERALL EQUIPMENT PLAN.pdf
    .pdf2.6 MBNot yet available
  • FINAL COORDINATION STUDY -- 12-17-19.pdf
    .pdf11.2 MBNot yet available
  • 01 45 35a - Schedule of SI.pdf
    .pdf114 KBNot yet available
  • 28 05 00 - Common Work Results for Electronic Safety and Security.pdf
    .pdf349 KBNot yet available
  • 11.10_PD102.5 - PLUMBING SECOND FLOOR DEMOLITION PLAN PHASE 5.pdf
    .pdf526 KBNot yet available
  • 2026-0629 Cath Lab II - BID Dwgs - Add 01.pdf
    .pdf50.0 MBNot yet available
  • S-102824-291.pdf
    .pdf1.1 MBNot yet available
  • 09 54 00 - Operating Room Modular Diffuser System.pdf
    .pdf146 KBNot yet available
  • Calculation of Contractor Self Performed Work.xlsx
    .xlsx13 KBNot yet available
  • 13.10_MH102.4 - MECHANICAL SECOND FLOOR HVAC PLAN - PHASE 4.pdf
    .pdf1.1 MBNot yet available
  • 36C24926R0057 0003.pdf
    .pdf127 KBNot yet available
  • 14.02_E102 - SECOND FLOOR OVERALL PLAN.pdf
    .pdf467 KBNot yet available
  • 14.00_E001 - ELECTRICAL LEGENDS AND ABBREVIATIONS.pdf
    .pdf252 KBNot yet available
  • 11.22_PL601 - PLUMBING SCHEDULES and DIAGRAMS.pdf
    .pdf332 KBNot yet available
  • 09 05 16 - Subsurface Preparation For Floor Finishes.pdf
    .pdf143 KBNot yet available
  • 14.06_ED102.2.2 - PHASE 2 DEMOLITION TECH FIRE ALARM PLAN.pdf
    .pdf620 KBNot yet available
  • Revised Cath Shielding 2024.pdf
    .pdf513 KBNot yet available
  • Project 621-22-121 RFI Log - Mt Home Cath Lab to VA 7-24-26.xlsx
    .xlsx78 KBNot yet available
  • 10 51 26 - Plastic Lockers and Bench.pdf
    .pdf137 KBNot yet available
  • 01 45 35b - Statement of SI.pdf
    .pdf39 KBNot yet available
  • 07.705_AF702.5 - PHASE FIVE FINISH PLANS.pdf
    .pdf4.5 MBNot yet available
  • 14.29_E501 - TECHNOLOGY DETAILS.pdf
    .pdf348 KBNot yet available

Contacts

Similar contracts

Explore more