Civic AI
Civic AI
Procurement intelligence
SAM.gov36C24926R0057
Open

621-22-121 Renovate Bldg. 204 for Cath Lab II - Engineering

Response deadline
Aug 10, 2026
Closed
Date posted
Jul 27, 2026

Description

The James H. Quillen VA Medical Center located in Mountain Home (Johnson City), Tennessee has a requirement for Renovate Building 204 Cath Lab II in accordance with (IAW) the provided specifications and drawings. This project consists of all supervision, labor, materials, equipment, and transportation. Amendment 0001 - provides revised drawings and specs Amendment 0002 - provides Site Visit sign-in sheet Amendment 0003 - provides RFIs and responses, revised specs and drawing, cath shielding, final coordination study for reference, and an addendum summary for the drawing and spec changes. This extends proposal responses to 8/10/2026

Classifications

Documents (53)

  • 07.734_AQ732.4 - EQUIPMENT PLANS - PHASE FOUR.pdf
    .pdf3.5 MBNot yet available
  • 14.20_EE102.2.2 - PHASE 2 ENLARGED TECH FIRE ALARM PLAN.pdf
    .pdf865 KBNot yet available
  • 14.11_ED102.4.2 - PHASE 4 DEMOLITION TECH FIRE ALARM PLAN.pdf
    .pdf423 KBNot yet available
  • Contractor EMR Certification Form.docx
    .docx18 KBNot yet available
  • 14.08_ED102.3.2 - PHASE 3 DEMOLITION TECH FIRE ALARM PLAN.pdf
    .pdf512 KBNot yet available
  • 14.04_ED102.1.2 - PHASE 1 DEMOLITION TECH FIRE ALARM PLAN.pdf
    .pdf358 KBNot yet available
  • 14.24_EE102.4.2 - PHASE 4 ENLARGED TECH FIRE ALARM PLAN.pdf
    .pdf1.1 MBNot yet available
  • 14.22_EE102.3.2 - PHASE 3 ENLARGED TECH FIRE ALARM PLAN.pdf
    .pdf583 KBNot yet available
  • 00 00 00 - Specification Cover.pdf
    .pdf231 KBNot yet available
  • 14.27_EE102.5.3 - PHASE 5 ENLARGED LIGHTING TECH PLAN.pdf
    .pdf399 KBNot yet available
  • 36C24926R0057_1.pdf
    .pdf1.7 MBNot yet available
  • 07 41 13 - Insulated Metal Roof Panels.pdf
    .pdf118 KBNot yet available
  • 621-22-121 Site Visit Sign in sheet.pdf
    .pdf643 KBNot yet available
  • 13.12_MH103 - MECHANICAL ROOF HVAC PLAN.pdf
    .pdf487 KBNot yet available
  • 07.704_AF702.4 - PHASE FOUR FINISH PLANS.pdf
    .pdf3.4 MBNot yet available
  • 2026-0629 Cath Lab II - BID specs - Add 01.pdf
    .pdf14.8 MBNot yet available
  • 14.13_ED102.5.2 - PHASE 5 DEMOLITION TECH FIRE ALARM PLAN.pdf
    .pdf511 KBNot yet available
  • 23 82 00 - Convection Heating and Cooling Units.pdf
    .pdf24 KBNot yet available
  • General Conditions Breakout.xlsx
    .xlsx13 KBNot yet available
  • 28 23 00 - Video Surveillance.pdf
    .pdf355 KBNot yet available
  • 36C24926R0057 0001.pdf
    .pdf122 KBNot yet available
  • Past_Performance_Questionnaire.docx
    .docx39 KBNot yet available
  • 01 45 35 - Special Inspections.pdf
    .pdf69 KBNot yet available
  • 14.16_EE102.1.2 - PHASE 1 ENLARGED TECH FIRE ALARM PLAN.pdf
    .pdf605 KBNot yet available
  • 00 01 10 - Table Of Contents.pdf
    .pdf38 KBNot yet available
  • Price Breakout Schedule.xlsx
    .xlsx29 KBNot yet available
  • 36C24926R0057 0002.pdf
    .pdf121 KBNot yet available
  • 2026-0724 Addendum 02 Summary.docx
    .docx45 KBNot yet available
  • WD TN20260191 2 Jan 2026.pdf
    .pdf238 KBNot yet available
  • 14.26_EE102.5.2 - PHASE 5 ENLARGED TECH FIRE ALARM PLAN.pdf
    .pdf771 KBNot yet available
  • 14.38_E600 - PARTIAL SINGLE LINE DIAGRAM.pdf
    .pdf277 KBNot yet available
  • 07.730_AQ732 - OVERALL EQUIPMENT PLAN.pdf
    .pdf2.6 MBNot yet available
  • FINAL COORDINATION STUDY -- 12-17-19.pdf
    .pdf11.2 MBNot yet available
  • 01 45 35a - Schedule of SI.pdf
    .pdf114 KBNot yet available
  • 28 05 00 - Common Work Results for Electronic Safety and Security.pdf
    .pdf349 KBNot yet available
  • 11.10_PD102.5 - PLUMBING SECOND FLOOR DEMOLITION PLAN PHASE 5.pdf
    .pdf526 KBNot yet available
  • 2026-0629 Cath Lab II - BID Dwgs - Add 01.pdf
    .pdf50.0 MBNot yet available
  • S-102824-291.pdf
    .pdf1.1 MBNot yet available
  • 09 54 00 - Operating Room Modular Diffuser System.pdf
    .pdf146 KBNot yet available
  • Calculation of Contractor Self Performed Work.xlsx
    .xlsx13 KBNot yet available
  • 13.10_MH102.4 - MECHANICAL SECOND FLOOR HVAC PLAN - PHASE 4.pdf
    .pdf1.1 MBNot yet available
  • 36C24926R0057 0003.pdf
    .pdf127 KBNot yet available
  • 14.02_E102 - SECOND FLOOR OVERALL PLAN.pdf
    .pdf467 KBNot yet available
  • 14.00_E001 - ELECTRICAL LEGENDS AND ABBREVIATIONS.pdf
    .pdf252 KBNot yet available
  • 11.22_PL601 - PLUMBING SCHEDULES and DIAGRAMS.pdf
    .pdf332 KBNot yet available
  • 09 05 16 - Subsurface Preparation For Floor Finishes.pdf
    .pdf143 KBNot yet available
  • 14.06_ED102.2.2 - PHASE 2 DEMOLITION TECH FIRE ALARM PLAN.pdf
    .pdf620 KBNot yet available
  • Revised Cath Shielding 2024.pdf
    .pdf513 KBNot yet available
  • Project 621-22-121 RFI Log - Mt Home Cath Lab to VA 7-24-26.xlsx
    .xlsx78 KBNot yet available
  • 10 51 26 - Plastic Lockers and Bench.pdf
    .pdf137 KBNot yet available
  • 01 45 35b - Statement of SI.pdf
    .pdf39 KBNot yet available
  • 07.705_AF702.5 - PHASE FIVE FINISH PLANS.pdf
    .pdf4.5 MBNot yet available
  • 14.29_E501 - TECHNOLOGY DETAILS.pdf
    .pdf348 KBNot yet available

Contacts

Similar contracts

Explore more