SAM.gov36C24926R0057
Open
621-22-121 Renovate Bldg. 204 for Cath Lab II - Engineering
- Response deadline
- Aug 10, 2026 Closed
- Date posted
- Jul 27, 2026
- Source
- Open notice
Description
The James H. Quillen VA Medical Center located in Mountain Home (Johnson City), Tennessee has a requirement for Renovate Building 204 Cath Lab II in accordance with (IAW) the provided specifications and drawings. This project consists of all supervision, labor, materials, equipment, and transportation. Amendment 0001 - provides revised drawings and specs Amendment 0002 - provides Site Visit sign-in sheet Amendment 0003 - provides RFIs and responses, revised specs and drawing, cath shielding, final coordination study for reference, and an addendum summary for the drawing and spec changes. This extends proposal responses to 8/10/2026
Classifications
Documents (53)
- 07.734_AQ732.4 - EQUIPMENT PLANS - PHASE FOUR.pdf.pdf3.5 MBNot yet available
- 14.20_EE102.2.2 - PHASE 2 ENLARGED TECH FIRE ALARM PLAN.pdf.pdf865 KBNot yet available
- 14.11_ED102.4.2 - PHASE 4 DEMOLITION TECH FIRE ALARM PLAN.pdf.pdf423 KBNot yet available
- Contractor EMR Certification Form.docx.docx18 KBNot yet available
- 14.08_ED102.3.2 - PHASE 3 DEMOLITION TECH FIRE ALARM PLAN.pdf.pdf512 KBNot yet available
- 14.04_ED102.1.2 - PHASE 1 DEMOLITION TECH FIRE ALARM PLAN.pdf.pdf358 KBNot yet available
- 14.24_EE102.4.2 - PHASE 4 ENLARGED TECH FIRE ALARM PLAN.pdf.pdf1.1 MBNot yet available
- 14.22_EE102.3.2 - PHASE 3 ENLARGED TECH FIRE ALARM PLAN.pdf.pdf583 KBNot yet available
- 00 00 00 - Specification Cover.pdf.pdf231 KBNot yet available
- 14.27_EE102.5.3 - PHASE 5 ENLARGED LIGHTING TECH PLAN.pdf.pdf399 KBNot yet available
- 36C24926R0057_1.pdf.pdf1.7 MBNot yet available
- 07 41 13 - Insulated Metal Roof Panels.pdf.pdf118 KBNot yet available
- 621-22-121 Site Visit Sign in sheet.pdf.pdf643 KBNot yet available
- 13.12_MH103 - MECHANICAL ROOF HVAC PLAN.pdf.pdf487 KBNot yet available
- 07.704_AF702.4 - PHASE FOUR FINISH PLANS.pdf.pdf3.4 MBNot yet available
- 2026-0629 Cath Lab II - BID specs - Add 01.pdf.pdf14.8 MBNot yet available
- 14.13_ED102.5.2 - PHASE 5 DEMOLITION TECH FIRE ALARM PLAN.pdf.pdf511 KBNot yet available
- 23 82 00 - Convection Heating and Cooling Units.pdf.pdf24 KBNot yet available
- General Conditions Breakout.xlsx.xlsx13 KBNot yet available
- 28 23 00 - Video Surveillance.pdf.pdf355 KBNot yet available
- 36C24926R0057 0001.pdf.pdf122 KBNot yet available
- Past_Performance_Questionnaire.docx.docx39 KBNot yet available
- 01 45 35 - Special Inspections.pdf.pdf69 KBNot yet available
- 14.16_EE102.1.2 - PHASE 1 ENLARGED TECH FIRE ALARM PLAN.pdf.pdf605 KBNot yet available
- 00 01 10 - Table Of Contents.pdf.pdf38 KBNot yet available
- Price Breakout Schedule.xlsx.xlsx29 KBNot yet available
- 36C24926R0057 0002.pdf.pdf121 KBNot yet available
- 2026-0724 Addendum 02 Summary.docx.docx45 KBNot yet available
- WD TN20260191 2 Jan 2026.pdf.pdf238 KBNot yet available
- 14.26_EE102.5.2 - PHASE 5 ENLARGED TECH FIRE ALARM PLAN.pdf.pdf771 KBNot yet available
- 14.38_E600 - PARTIAL SINGLE LINE DIAGRAM.pdf.pdf277 KBNot yet available
- 07.730_AQ732 - OVERALL EQUIPMENT PLAN.pdf.pdf2.6 MBNot yet available
- FINAL COORDINATION STUDY -- 12-17-19.pdf.pdf11.2 MBNot yet available
- 01 45 35a - Schedule of SI.pdf.pdf114 KBNot yet available
- 28 05 00 - Common Work Results for Electronic Safety and Security.pdf.pdf349 KBNot yet available
- 11.10_PD102.5 - PLUMBING SECOND FLOOR DEMOLITION PLAN PHASE 5.pdf.pdf526 KBNot yet available
- 2026-0629 Cath Lab II - BID Dwgs - Add 01.pdf.pdf50.0 MBNot yet available
- S-102824-291.pdf.pdf1.1 MBNot yet available
- 09 54 00 - Operating Room Modular Diffuser System.pdf.pdf146 KBNot yet available
- Calculation of Contractor Self Performed Work.xlsx.xlsx13 KBNot yet available
- 13.10_MH102.4 - MECHANICAL SECOND FLOOR HVAC PLAN - PHASE 4.pdf.pdf1.1 MBNot yet available
- 36C24926R0057 0003.pdf.pdf127 KBNot yet available
- 14.02_E102 - SECOND FLOOR OVERALL PLAN.pdf.pdf467 KBNot yet available
- 14.00_E001 - ELECTRICAL LEGENDS AND ABBREVIATIONS.pdf.pdf252 KBNot yet available
- 11.22_PL601 - PLUMBING SCHEDULES and DIAGRAMS.pdf.pdf332 KBNot yet available
- 09 05 16 - Subsurface Preparation For Floor Finishes.pdf.pdf143 KBNot yet available
- 14.06_ED102.2.2 - PHASE 2 DEMOLITION TECH FIRE ALARM PLAN.pdf.pdf620 KBNot yet available
- Revised Cath Shielding 2024.pdf.pdf513 KBNot yet available
- Project 621-22-121 RFI Log - Mt Home Cath Lab to VA 7-24-26.xlsx.xlsx78 KBNot yet available
- 10 51 26 - Plastic Lockers and Bench.pdf.pdf137 KBNot yet available
- 01 45 35b - Statement of SI.pdf.pdf39 KBNot yet available
- 07.705_AF702.5 - PHASE FIVE FINISH PLANS.pdf.pdf4.5 MBNot yet available
- 14.29_E501 - TECHNOLOGY DETAILS.pdf.pdf348 KBNot yet available
Contacts
- Contract Specialistjeannette.morphew@va.gov615867600020230
- john.mccomas@va.gov6152256972
Similar contracts
- 2-STEP SEALED BID - TINKER AFB WWYK250019 Remove and Replace Fire Sprinkler in Plasma Booth Dust Collectors and Replace the Building F/A System, B3221OklahomaDue Oct 30, 2026
- Sources Sought / Market Intelligence: Multi-Projects for Army Reserve Program – Construction Management at Risk (CM@Risk) utilizing Other Transaction Authority (OTA)Due Oct 5, 2026
- PLA Survey for Human Performance Wig Lab at WPAFBOhioDue Oct 7, 2026
- HST Roof Safety Construction ProjectDistrict of ColumbiaDue Oct 19, 2026
- Construct US Space Force Integration Facility, F/10852 Wpafb, OhioOhioDue Oct 6, 2026
- Fort Lee Vehicle Recovery RangeVirginiaDue Oct 13, 2026